Quick answers
What is Project by Divis Laboratories Limited?
This proposed project by Divis Laboratories Limited is in Konaforest, Thondangi, Kakinada, Andhra Pradesh. The site covers 505 acres.
Who is building it?
The applicant is Divis Laboratories Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Konaforest, Thondangi, Kakinada, Andhra Pradesh.
How big is it?
It has a site of 505 acres.
When was it filed?
The application was filed on 1 Jul 2024.
Project details
| Status | Initial checks |
|---|---|
| Status since | 1 Jul 2024 |
| Application filed | 1 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Other |
| Applicant | Divis Laboratories Limited |
| Land area | 505 acres (204.4 ha) |
| Village / locality | Konaforest |
| Taluk / tehsil | Thondangi |
| District | Kakinada |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01777 |
In context
11 applications in Kakinada since January 2022 are in the same category (Other): 0 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. At 505 acres, this one is larger than 64% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Konaforest, Thondangi, Kakinada, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Setting up Bulk Drugs Manufacturing Unit — environmental approval granted, 0 m away
- Setting up Bulk Drugs Manufacturing Unit — withdrawn, 0 m away
- Common Treated Wastewater Conveyance and Marine Outfall System for Discharge… — application filed, 1.2 km away
- CRZ Clearance of the Extension of the Existing Treated Effluent Disposal… — coastal clearance granted, 1.4 km away
- Divis Laboratories Limited -Installation of Desalination Plant Associated… — coastal clearance granted, 1.4 km away
- Industrial project by M/s. Neuland Laboratories Ltd Kakinada Site — under environmental review, 2.9 km away
- Industrial project by M/s. Neuland Laboratories Ltd Kakinada Site — cleared for impact study, 2.9 km away
- Kakinada SEZ Port Phase-1 — lapsed, 3.1 km away
More from Divis Laboratories Limited in Kakinada
- CRZ Clearance of the Extension of the Existing Treated Effluent Disposal… — coastal clearance granted
- Setting up Bulk Drugs Manufacturing Unit — environmental approval granted
- Setting up Bulk Drugs Manufacturing Unit — withdrawn
- Divis Laboratories Limited -Installation of Desalination Plant Associated… — coastal clearance granted
5 Divis Laboratories projects in Kakinada
All 13 Divis Laboratories projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.