Quick answers
What is this project?
Proposed Road Metal, Ballast, Morrum/Gravel and Ordinary Earth Project of M/s KCVR Infra Projects Private Limited, M.g Part: Sri Karnati Suresh Reddy is an approved mining project in Bhanumukkala, Pamulapadu, Nandyal, Andhra Pradesh. The site covers 9.8 acres.
Who is building it?
The applicant is K.C.V.R Infra Projects Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 Jan 2026), as of 27 Nov 2026.
Where is it?
In Bhanumukkala, Pamulapadu, Nandyal, Andhra Pradesh.
How big is it?
It has a stated cost of ₹59 lakh and a site of 9.8 acres.
When was it filed?
The application was filed on 22 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Jan 2026 |
| Application filed | 22 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | K.C.V.R Infra Projects Private Limited |
| Land area | 9.8 acres (4 ha) |
| Project cost | ₹59 lakh |
| Village / locality | Bhanumukkala |
| Taluk / tehsil | Pamulapadu |
| District | Nandyal |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02031 |
In context
135 applications in Nandyal since January 2022 are in the same category (Mining): 80 approved, 16 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 9.8 acres, this one is smaller than 53% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bhanumukkala, Pamulapadu, Nandyal, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Upgradation of 2/4 Lane With Paved Shoulders Confirmation of Newly Declared… — lapsed, 5.3 km away
- Upgradation of 2/4 Lane With Paved Shoulders Confirmation of Newly Declared… — application filed, 5.3 km away
- Upgradation of 2/4 Lane With Paved Shoulders Confirmation of Newly Declared… — lapsed, 5.3 km away
- BSNL 4G SATURATION PROJECT_Narapureddykunta_Nandyal_Andhra Pradesh — more information requested, 18.5 km away
- BSNL 4G SATURATION PROJECT_Narapureddykunta_Nandyal_Andhra Pradesh — lapsed, 18.5 km away
- Laying of Optical Fibre Cable for Provision of 4g Based Mobile Services at Mha… — under wildlife review, 21.7 km away
- Laying of Optical Fibre Cable for Provision of 4g Based Mobile Services at Mha… — lapsed, 21.7 km away
- Sri M.Mahesh Khanna (2.834 Hect- Lime Stone quarry ) — environmental approval granted, 28.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.