BSNL 4G SATURATION PROJECT_Narapureddykunta_Nandyal_Andhra Pradesh is a lapsed project in Narayanapuram, Bandi Atmakur, Nandyal, Andhra Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 4 Mar 2024, so it is no longer under consideration.
Where is it?
In Narayanapuram, Bandi Atmakur, Nandyal, Andhra Pradesh.
How big is it?
It has a stated cost of ₹1 crore; a site of 0 acres and 190 m² of forest land.
When was it filed?
The application was filed on 23 Oct 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: BSNL 4G SATURATION PROJECT_Narapureddykunta_Nandyal_Andhra Pradesh
Project details
| Status | Lapsed |
|---|---|
| Status since | 4 Mar 2024 |
| Application filed | 23 Oct 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 190 m² |
| Project cost | ₹1 crore |
| Village / locality | Narayanapuram |
| Taluk / tehsil | Bandi Atmakur |
| District | Nandyal |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05019 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Oct 2023 (this page) | Lapsed | 0 acres | ₹1 crore |
| New project filed 23 Oct 2023 | More information requested | 0 acres | ₹1 crore |
In context
6 applications in Nandyal since January 2022 are in the same category (Other): 0 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected.
Where it is
Narayanapuram, Bandi Atmakur, Nandyal, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- BSNL 4G SATURATION PROJECT_Narapureddykunta_Nandyal_Andhra Pradesh — more information requested, 0 m away
- Proposals for Diversion of Forest Land Over an Extent of 0.27 Ha in… — lapsed, 10.6 km away
- Upgradation of 2/4 Lane With Paved Shoulders Confirmation of Newly Declared… — lapsed, 13.3 km away
- Upgradation of 2/4 Lane With Paved Shoulders Confirmation of Newly Declared… — application filed, 13.3 km away
- Upgradation of 2/4 Lane With Paved Shoulders Confirmation of Newly Declared… — lapsed, 13.3 km away
- Proposed Road Metal, Ballast, Morrum/Gravel and Ordinary Earth Project of M/s… — environmental approval granted, 18.5 km away
- Sri M.Mahesh Khanna (2.834 Hect- Lime Stone quarry ) — environmental approval granted, 22.5 km away
- Additional Infall Regulator With 03 Vents to Accommodate 10,000 Cusecs… — initial checks, 24.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.