Quick answers
What is Permission to Produce Absolute Alcohol?
Permission to Produce Absolute Alcohol is an approved industrial project in Annadevarapeta, Tallapudi, East Godavari, Andhra Pradesh. The site covers 22.5 acres.
Who is building it?
The applicant is Capricorn Distillery Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Oct 2025), as of 27 Nov 2026.
Where is it?
In Annadevarapeta, Tallapudi, East Godavari, Andhra Pradesh.
How big is it?
It has a stated cost of ₹67.3 crore and a site of 22.5 acres.
When was it filed?
The application was filed on 3 Sept 2025.
Project details
| Official title | Proposal for Permission to Produce Absolute Alcohol Along With Ena/Fuel-Grade Ethanol in the Existing Plant and to Enhance the Production Capacity of Ena/Fuel-Grade Ethanol/Absolute Alcohol From 90 Klpd to 180 Klpd (120 Klpd Using Grains As Raw Material and an Additional 60 Klpd by Procuring Rectified Spirit From External Sources) |
|---|---|
| Status | Environmental approval granted |
| Status since | 12 Oct 2025 |
| Application filed | 3 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Capricorn Distillery Private Limited |
| Land area | 22.5 acres (9.1 ha) |
| Project cost | ₹67.3 crore |
| Village / locality | Annadevarapeta |
| Taluk / tehsil | Tallapudi |
| District | East Godavari |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02380 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 3 Sept 2025 (this page) | Environmental approval granted | 22.5 acres | ₹67.3 crore |
| Early planning filed 12 Dec 2024 | Cleared for impact study | 22.5 acres | ₹67.3 crore |
In context
17 applications in East Godavari since January 2022 are in the same category (Industry): 8 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 22.5 acres, this one is smaller than 82% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Annadevarapeta, Tallapudi, East Godavari, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Permission to Produce Absolute Alcohol — cleared for impact study, 0 m away
- As Per Requirement of Eia Notification, 2006 [as Amended to the Date] This Is… — initial checks, 50 m away
- As Per Requirement of Eia Notification, 2006 [as Amended to the Date] This Is… — initial checks, 50 m away
- Submission of EC Corrigendum application to mention the List of By-products in… — returned to applicant, 2.2 km away
- Submission of No Increase in Pollution Load by M/s. Tagoor Laboratories… — initial checks, 2.4 km away
- Submission of No Increase in Pollution Load (NIPL) of M/s. Tibro… — initial checks, 2.6 km away
- Proposed Change in Product Mix Without Increase in Pollution Load and… — initial checks, 3.9 km away
- Tadipudi Sand Reach — environmental approval granted, 7.1 km away
More from Capricorn Distillery Private Limited in East Godavari
- As Per Requirement of Eia Notification, 2006 [as Amended to the Date] This Is… — initial checks
- As Per Requirement of Eia Notification, 2006 [as Amended to the Date] This Is… — initial checks
All 4 Capricorn Distillery projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.