Quick answers
What is this project?
Submission of No Increase in Pollution Load (NIPL) of M/s. Tibro Pharmaceuticals Private Limited established a Synthetic Organic Chemicals (Bulk Drug & Intermediates) manufacturing unit at Sy. No.: 320-26, Bhimolu (V), Gopalapuram Mandal, East Godavari (Dist.), Andhra Pradesh in an area of 10.01 acres (40509.03 SQM) is a proposed industrial project in Bhimolu, Gopalapuram, East Godavari, Andhra Pradesh. The site covers 10 acres.
Who is building it?
The applicant is Proposed Bulk Drugs & Drug Intermediates Manufacturing Unit by Tibro Pharmaceuticals PVT. LTD..
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Bhimolu, Gopalapuram, East Godavari, Andhra Pradesh.
How big is it?
It has a stated cost of ₹15 crore and a site of 10 acres.
When was it filed?
The application was filed on 17 Sept 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 17 Sept 2026 |
| Application filed | 17 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Proposed Bulk Drugs & Drug Intermediates Manufacturing Unit by Tibro Pharmaceuticals PVT. LTD. |
| Land area | 10 acres (4.1 ha) |
| Project cost | ₹15 crore |
| Village / locality | Bhimolu |
| Taluk / tehsil | Gopalapuram |
| District | East Godavari |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03494 |
In context
17 applications in East Godavari since January 2022 are in the same category (Industry): 8 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 10 acres, this one is smaller than 94% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhimolu, Gopalapuram, East Godavari, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Submission of No Increase in Pollution Load by M/s. Tagoor Laboratories… — initial checks, 650 m away
- Submission of EC Corrigendum application to mention the List of By-products in… — returned to applicant, 800 m away
- As Per Requirement of Eia Notification, 2006 [as Amended to the Date] This Is… — initial checks, 2.6 km away
- As Per Requirement of Eia Notification, 2006 [as Amended to the Date] This Is… — initial checks, 2.6 km away
- Permission to Produce Absolute Alcohol — environmental approval granted, 2.6 km away
- Permission to Produce Absolute Alcohol — cleared for impact study, 2.6 km away
- Proposed Change in Product Mix Without Increase in Pollution Load and… — initial checks, 4.7 km away
- Chintalapudi Lift Irrigation Scheme — lapsed, 7.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.