Project details
| Official title | 3 x 504 KLPD Grain based Ethanol Plant along with 1 x 12 MW & 1 x 25 MW Co-generation Power plant in phases - KRISHNA AGRO FUELS PRIVATE LIMITED |
|---|---|
| Status | Cleared for impact study |
| Status since | 10 Dec 2025 |
| Application filed | 21 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Krishna Agro Fuels Private Limited |
| Land area | 63.8 acres (25.8 ha) |
| Project cost | ₹1,602 crore |
| Village / locality | Pondugala |
| Taluk / tehsil | Dachepalle |
| District | Palnadu |
| State | Andhra Pradesh |
| Location from | Site area on record |
| Our reference | WID-AP-02400 |
In context
17 applications in Palnadu since January 2022 are in the same category (Industry): 7 approved, 4 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 63.8 acres, this one is smaller than 82% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pondugala, Dachepalle, Palnadu, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri. Mandapati Ramesh Reddy, Lime Stone (Minor), 1.0 Hectare, Sy.No.339/15-1,… — lapsed, 2.1 km away
- Diversion of 6.43 ha forest land for infrastructure development in the temple… — more information requested, 2.2 km away
- Diversion of 6.43 ha forest land for infrastructure development in the temple… — lapsed, 2.7 km away
- Proposed Ramapuram Limestone Block (Area: 398.539ha) with Proposed Limestone… — under environmental review, 3.6 km away
- Extension of validity of existing Environmental Clearance granted for… — environmental approval granted, 3.8 km away
- Cement Plant (Clinker -2.50 MTPA and Cement -2.50 MTPA) — environmental approval granted, 3.8 km away
- Cement Plant (Clinker 2.5 MTPA ; Cement 2.5 MTPA) — withdrawn, 3.8 km away
- Change in the Configuration of Cement Mills by Installing a New 210 Tph Vrm,… — initial checks, 4.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.