Project details
| Status | More information requested |
|---|---|
| Status since | 4 Oct 2026 |
| Application filed | 21 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Sri Amaralingeswara Swami Vari Devastanam Daidabilam |
| Land area | 15.9 acres (6.4 ha) |
| Forest land | 15.9 acres (6.4 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Pondugala |
| Taluk / tehsil | Dachepalle |
| District | Palnadu |
| State | Andhra Pradesh |
| Location from | Site area on record |
| Our reference | WID-AP-04838 |
In context
10 applications in Palnadu since January 2022 are in the same category (Other): 1 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. At 15.9 acres, this one is larger than 80% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pondugala, Dachepalle, Palnadu, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 6.43 ha forest land for infrastructure development in the temple… — lapsed, 750 m away
- 3 x 504 KLPD Grain based Ethanol Plant — cleared for impact study, 2.2 km away
- Sri. Mandapati Ramesh Reddy, Lime Stone (Minor), 1.0 Hectare, Sy.No.339/15-1,… — lapsed, 2.3 km away
- Sri Navuluri Srirama Murthy – 0.75 Ha — environmental approval granted, 5 km away
- Proposed Ramapuram Limestone Block (Area: 398.539ha) with Proposed Limestone… — under environmental review, 5.6 km away
- Extension of validity of existing Environmental Clearance granted for… — environmental approval granted, 5.7 km away
- Cement Plant (Clinker -2.50 MTPA and Cement -2.50 MTPA) — environmental approval granted, 5.7 km away
- Cement Plant (Clinker 2.5 MTPA ; Cement 2.5 MTPA) — withdrawn, 5.7 km away
More from Sri Amaralingeswara Swami Vari Devastanam Daidabilam in Palnadu
- Diversion of 0.27 ha of Forest Land to lay Steps on Kottappakonda Hill top of… — lapsed
- Diversion of 6.43 ha forest land for infrastructure development in the temple… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.