One of 2 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/s S.R. Constructions Company
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Sept 2025 |
| Application filed | 26 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | S R Constructions Company |
| Land area | 36.3 acres (14.7 ha) |
| Project cost | ₹1 crore |
| Village / locality | Konidena |
| Taluk / tehsil | Ballikurava |
| District | Bapatla |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02571 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 24 Jun 2026 | Environmental approval granted | 12.5 acres | ₹50 lakh |
| Validity extension filed 26 Jul 2025 (this page) | Environmental approval granted | 36.3 acres | ₹1 crore |
In context
145 applications in Bapatla since January 2022 are in the same category (Mining): 117 approved, 9 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 36.3 acres, this one is larger than 95% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 71.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 44 mining leases have applied within 5 km.
Where it is
Konidena, Ballikurava, Bapatla, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. Kishore Granites Pvt. Ltd — environmental approval granted, 250 m away
- Mining project by M/s. Kishore Granites Pvt. Ltd — cleared for impact study, 250 m away
- Mining project by M/s. Sri Srinivasa Granites — lapsed, 250 m away
- Mining project by M/s. Sri Srinivasa Granites — lapsed, 250 m away
- Mining project by M/s. Sri Srinivasa Granites — environmental approval granted, 300 m away
- Mining project by M/s Sri Srinivasa Granites — environmental approval granted, 300 m away
- Mining project by M/s. Sri Srinivasa Granites — lapsed, 300 m away
- Mining project by M/s. Sri Srinivasa Granites — lapsed, 300 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.