Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Jul 2026 |
| Application filed | 24 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | S R Constructions Company |
| Land area | 12.5 acres (5.1 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Konidena |
| Taluk / tehsil | Ballikurava |
| District | Bapatla |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04104 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 24 Jun 2026 (this page) | Environmental approval granted | 12.5 acres | ₹50 lakh |
| Validity extension filed 26 Jul 2025 | Environmental approval granted | 36.3 acres | ₹1 crore |
In context
145 applications in Bapatla since January 2022 are in the same category (Mining): 117 approved, 9 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.5 acres, this one is larger than 88% of them.
No other mining lease on record is within 500 m of this site; 46 have applied within 5 km.
Where it is
Konidena, Ballikurava, Bapatla, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s S.R. Constructions Company — environmental approval granted, 1.1 km away
- Mining project by M/s. Krishna Sai Exports Pvt. Ltd. — environmental approval granted, 1.2 km away
- Mining project by M/s. Krishna Sai Exports Pvt Limited., — environmental approval granted, 1.3 km away
- Mining project by M/s Krishna Sai Exports Private Limited — environmental approval granted, 1.3 km away
- Mining project by M/s Krishna Sai Exports Private Limited — lapsed, 1.3 km away
- Mining project by M/s. Sri Srinivasa Granites — lapsed, 1.3 km away
- Mining project by M/s. Sri Srinivasa Granites — lapsed, 1.3 km away
- Mining project by M/s. Sri Srinivasa Granites — environmental approval granted, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.