Quick answers
What is this project?
Expansion of Cement Plant (Clinker from 3.15 MTPA to 6.3 MTPA, Cement from 2.0 MTPA to 5.0 MTPA, WHRB 12.15 MW to 27.15 MW) by The Ramco Cements Limited is an approved industrial project in Kotapadu, Kolimigundla, Nandyal, Andhra Pradesh. The site covers 598 acres.
Who is building it?
The applicant is The Ramco Cements Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Jun 2025), as of 27 Nov 2026.
Where is it?
In Kotapadu, Kolimigundla, Nandyal, Andhra Pradesh.
How big is it?
It has a stated cost of ₹3,478 crore and a site of 598 acres.
When was it filed?
The application was filed on 7 Apr 2025.
Project details
| Official title | Expansion of Cement Plant (Clinker from 3.15 MTPA to 6.3 MTPA, Cement from 2.0 MTPA to 5.0 MTPA, WHRB 12.15 MW to 27.15 MW) at Kalvatala Village, Kolimigundla Mandal, Nandyal District, Andhra Pradesh by The Ramco Cements Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 19 Jun 2025 |
| Application filed | 7 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | The Ramco Cements Limited |
| Land area | 598 acres (242 ha) |
| Project cost | ₹3,478 crore |
| Village / locality | Kotapadu |
| Taluk / tehsil | Kolimigundla |
| District | Nandyal |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02679 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 7 Apr 2025 (this page) | Environmental approval granted | 598 acres | ₹3,478 crore |
| Early planning filed 2 Apr 2024 | Cleared for impact study | 598 acres | ₹3,478 crore |
In context
7 applications in Nandyal since January 2022 are in the same category (Industry): 4 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kotapadu, Kolimigundla, Nandyal, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Enhancement in Cement production (Line-I) from 2.0 MTPA to 2.4 MTPA, with no… — initial checks, 0 m away
- Amendment to the Environmental Clearance (Ec) for Specific Condition No III of… — environmental approval granted, 0 m away
- Expansion of Cement Plant (Clinker from 3.15 MTPA to 6.3 MTPA, Cement from 2.0… — cleared for impact study, 0 m away
- Expansion of Cement Plant (Clinker from 3.15 MTPA to 6.3 MTPA, Cement from 2.0… — withdrawn, 0 m away
- AMENDMENT IN CONSENT TO ESTABLISHMENT CHANGE IN CONFIGURATION OF CEMENT PLANT… — initial checks, 100 m away
- Expansion of Kotapadu Limestone Mine (Ml Area: 663.46 Ha.) of M/S.The Ramco… — under environmental review, 3.8 km away
- Expansion of Kotapadu Limestone Mine (Ml Area: 663.46 Ha.) of M/S.The Ramco… — environmental approval granted, 3.8 km away
- Kotapadu Limestone Mine — environmental approval granted, 3.8 km away
More from The Ramco Cements Limited in Nandyal
- Expansion of Kotapadu Limestone Mine (Ml Area: 663.46 Ha.) of M/S.The Ramco… — under environmental review
- Amendment in Environmental Clearance for Waiver of the Condition Pertaining to… — lapsed
- Expansion of Kotapadu Limestone Mine (Ml Area: 663.46 Ha.) of M/S.The Ramco… — environmental approval granted
- Enhancement in Cement production (Line-I) from 2.0 MTPA to 2.4 MTPA, with no… — initial checks
- Amendment to the Environmental Clearance (Ec) for Specific Condition No III of… — environmental approval granted
- Expansion of Cement Plant (Clinker from 3.15 MTPA to 6.3 MTPA, Cement from 2.0… — withdrawn
10 The Ramco Cements projects in Nandyal
All 72 The Ramco Cements projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.