What is Developing? Open the mapMap

Under environmental reviewMining · Nandyal, Andhra Pradesh

Expansion of Kotapadu Limestone Mine (Ml Area: 663.46 Ha.) of M/S.The Ramco Cements Limited (Trcl) for Enhancement of Rom Limestone Production Capacity From 4.4 Mtpa to 6.16 Mtpa With Total Material Handling at 6.742 Mtpa (6.16 Mtpa of Rom Limestone + 0.582 Mtpa of Topsoil), Constituting an Expansion of Up to 40% in Two Phases, in Accordance With the Moefcc Office Memorandums Dated 11.04.2022 and 30.05.2022 Under Para 7(Ii)(A) of the Eia Notification, 2006.

Expansion of Kotapadu Limestone Mine (Ml Area: 663.46 Ha.) of M/S.The Ramco Cements Limited (Trcl) for Enhancement of Rom Limestone Production Capacity From 4.4 Mtpa to 6.16 Mtpa With Total Material Handling at 6.742 Mtpa (6.16 Mtpa of Rom Limestone + 0.582 Mtpa of Topsoil), Constituting an Expansion of Up to 40% in Two Phases, in Accordance With the Moefcc Office Memorandums Dated 11.04.2022 and 30.05.2022 Under Para 7(Ii)(A) of the Eia Notification, 2006 is a proposed mining project in Kalvatala, Kolimigundla, Nandyal, Andhra Pradesh. The site covers 1,639.4 acres. Its stated project cost is ₹14 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 29 Oct 2026).

See it on the live map All projects in Nandyal

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Kotapadu Limestone Mine (Ml Area: 663.46 Ha.) of M/S.The Ramco Cements Limited (Trcl) for Enhancement of Rom Limestone Production Capacity From 4.4 Mtpa to 6.16 Mtpa With Total Material Handling at 6.742 Mtpa (6.16 Mtpa of Rom Limestone + 0.582 Mtpa of Topsoil), Constituting an Expansion of Up to 40% in Two Phases, in Accordance With the Moefcc Office Memorandums Dated 11.04.2022 and 30.05.2022 Under Para 7(Ii)(A) of the Eia Notification, 2006 is a proposed mining project in Kalvatala, Kolimigundla, Nandyal, Andhra Pradesh. The site covers 1,639.4 acres.

Who is building it?

The applicant is The Ramco Cements Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Kalvatala, Kolimigundla, Nandyal, Andhra Pradesh.

How big is it?

It has a stated cost of ₹14 crore and a site of 1,639.4 acres.

When was it filed?

The application was filed on 27 Oct 2026.

Project details

StatusUnder environmental review
Status since29 Oct 2026
Application filed27 Oct 2026
Approval soughtEnvironmental approval
Application typeAmendment
SectorMining
ApplicantThe Ramco Cements Limited
Land area1,639.4 acres (663.5 ha)
Project cost₹14 crore
Village / localityKalvatala
Taluk / tehsilKolimigundla
DistrictNandyal
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-05239

In context

135 applications in Nandyal since January 2022 are in the same category (Mining): 80 approved, 16 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,639.4 acres, this one is larger than 95% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Kalvatala, Kolimigundla, Nandyal, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from The Ramco Cements Limited in Nandyal

10 The Ramco Cements projects in Nandyal
All 72 The Ramco Cements projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.