Quick answers
What is this project?
10.500 hectares of Building Stone, Manufactured Sand, Morrum/Gravel & Ordinary Earth, Road Metal and Ballast, Rough Stone / Boulders Quarry of Katneni Sri Venkata Uma Maheswara Kumar, Sy. No. 221/P of Ananthavaram Village, Thullur Mandal, Guntur District, Andhra Pradesh is a proposed mining project in Anantavaram, Thullur, Guntur, Andhra Pradesh. The site covers 25.9 acres.
Who is building it?
The applicant is Srivenkata Umamaheswara Kumar Katneni.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 14 Aug 2025), as of 27 Nov 2026.
Where is it?
In Anantavaram, Thullur, Guntur, Andhra Pradesh.
How big is it?
It has a stated cost of ₹1 crore and a site of 25.9 acres.
When was it filed?
The application was filed on 28 Jun 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: 10.500 hectares of Building Stone, Manufactured Sand, Morrum/Gravel & Ordinary Earth,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 14 Aug 2025 |
| Application filed | 28 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Srivenkata Umamaheswara Kumar Katneni |
| Land area | 25.9 acres (10.5 ha) |
| Project cost | ₹1 crore |
| Village / locality | Anantavaram |
| Taluk / tehsil | Thullur |
| District | Guntur |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02811 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Oct 2025 | Environmental approval granted | 25.9 acres | ₹1 crore |
| Early planning filed 28 Jun 2025 (this page) | Cleared for impact study | 25.9 acres | ₹1 crore |
In context
164 applications in Guntur since January 2022 are in the same category (Mining): 104 approved, 16 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 25.9 acres, this one is larger than 96% of them.
6 other mining leases have applied within 500 m of this site; together with this one they cover 130.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.
Where it is
Anantavaram, Thullur, Guntur, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 10.500 hectares of Building Stone, Manufactured Sand, Morrum/Gravel & Ordinary… — environmental approval granted, 0 m away
- 4.650 Hect. of Morrum/Gravel, Ordinary Earth & Road Metal, Ballast Quarry of… — environmental approval granted, 200 m away
- 4.650 Hect. of Morrum/Gravel, Ordinary Earth & Road Metal, Ballast Quarry of… — lapsed, 200 m away
- 6.00 Hect. of Road Metal & Gravel Quarry of Sri Kurra Jogeswara Rao, Sy. No.… — environmental approval granted, 200 m away
- 6.00 Hect. of Road Metal & Gravel Quarry of Sri Kurra Jogeswara Rao, Sy. No.… — cleared for impact study, 250 m away
- 4.60 Hect. of Morrum/Gravel, Ordinary Earth & Road Metal, Ballast Quarry of… — environmental approval granted, 250 m away
- 4.60 Hect. of Morrum/Gravel, Ordinary Earth & Road Metal, Ballast Quarry of… — lapsed, 250 m away
- Sri Polu Narasaiah — under environmental review, 350 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.