Quick answers
What is this project?
4.650 Hect. of Morrum/Gravel, Ordinary Earth & Road Metal, Ballast Quarry of M/s Countryside Region Developers LLP, Sy. No. 221-1 of Ananthavaram Village, Thullur Mandal, Guntur District, Andhra Pradesh is an approved mining project in Anantavaram, Thullur, Guntur, Andhra Pradesh. The site covers 11.5 acres.
Who is building it?
The applicant is Countryside Region Developers LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Oct 2025), as of 27 Nov 2026.
Where is it?
In Anantavaram, Thullur, Guntur, Andhra Pradesh.
How big is it?
It has a stated cost of ₹60 lakh and a site of 11.5 acres.
When was it filed?
The application was filed on 27 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Oct 2025 |
| Application filed | 27 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Countryside Region Developers LLP |
| Land area | 11.5 acres (4.7 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Anantavaram |
| Taluk / tehsil | Thullur |
| District | Guntur |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03265 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Sept 2025 (this page) | Environmental approval granted | 11.5 acres | ₹60 lakh |
| Early planning filed 22 Sept 2025 | Lapsed | 11.5 acres | ₹60 lakh |
In context
164 applications in Guntur since January 2022 are in the same category (Mining): 104 approved, 16 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.5 acres, this one is larger than 85% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 68.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.
Where it is
Anantavaram, Thullur, Guntur, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4.650 Hect. of Morrum/Gravel, Ordinary Earth & Road Metal, Ballast Quarry of… — lapsed, 0 m away
- 10.500 hectares of Building Stone, Manufactured Sand, Morrum/Gravel & Ordinary… — environmental approval granted, 200 m away
- 10.500 hectares of Building Stone, Manufactured Sand, Morrum/Gravel & Ordinary… — cleared for impact study, 200 m away
- 4.60 Hect. of Morrum/Gravel, Ordinary Earth & Road Metal, Ballast Quarry of… — environmental approval granted, 200 m away
- 4.60 Hect. of Morrum/Gravel, Ordinary Earth & Road Metal, Ballast Quarry of… — lapsed, 200 m away
- Sri Polu Narasaiah — under environmental review, 400 m away
- Sri Polu Narasaiah — more information requested, 400 m away
- 6.00 Hect. of Road Metal & Gravel Quarry of Sri Kurra Jogeswara Rao, Sy. No.… — environmental approval granted, 400 m away
All 6 Countryside Region Developers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.