Cleared for impact studyMining · Kakinada, Andhra Pradesh

Mining project by M/s Sidhvi Infrastructure Projects Limited

This proposed mining project by M/s Sidhvi Infrastructure Projects Limited is in Santha Pydipala, Rowthulapudi, Kakinada, Andhra Pradesh. The site covers 8.6 acres. Its stated project cost is ₹47 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 24 Jun 2025).

See it on the live map All projects in Kakinada

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Mining project by M/s Sidhvi Infrastructure Projects Limited?

This proposed mining project by M/s Sidhvi Infrastructure Projects Limited is in Santha Pydipala, Rowthulapudi, Kakinada, Andhra Pradesh. The site covers 8.6 acres.

Who is building it?

The applicant is Sidhvi Infrastructure Projects Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 24 Jun 2025), as of 27 Nov 2026.

Where is it?

In Santha Pydipala, Rowthulapudi, Kakinada, Andhra Pradesh.

How big is it?

It has a stated cost of ₹47 lakh and a site of 8.6 acres.

When was it filed?

The application was filed on 6 May 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/s Sidhvi Infrastructure Projects Limited

Project details

StatusCleared for impact study
Status since24 Jun 2025
Application filed6 May 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSidhvi Infrastructure Projects Limited
Land area8.6 acres (3.5 ha)
Project cost₹47 lakh
Village / localitySantha Pydipala
Taluk / tehsilRowthulapudi
DistrictKakinada
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-02911

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 2 Nov 2025Environmental approval granted8.6 acres₹47 lakh
Early planning filed 6 May 2025 (this page)Cleared for impact study8.6 acres₹47 lakh

In context

94 applications in Kakinada since January 2022 are in the same category (Mining): 64 approved, 11 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.6 acres, this one is larger than 53% of them.

7 other mining leases have applied within 500 m of this site; together with this one they cover 78.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 42 mining leases have applied within 5 km.

Where it is

Santha Pydipala, Rowthulapudi, Kakinada, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sidhvi Infrastructure Projects Limited in Kakinada

All 6 Sidhvi Infrastructure Projects projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.