Quick answers
What is Sri Ravi Babu V.S Peddi Reddi?
Sri Ravi Babu V.S Peddi Reddi is a proposed mining project in Chakirevulapalem, Rowthulapudi, Kakinada, Andhra Pradesh. The site covers 1.7 acres.
Who is building it?
The applicant is Sidhvi Infrastructure Projects Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Sept 2022), as of 27 Nov 2026.
Where is it?
In Chakirevulapalem, Rowthulapudi, Kakinada, Andhra Pradesh.
How big is it?
It has a stated cost of ₹40 lakh and a site of 1.7 acres.
When was it filed?
The application was filed on 29 Sept 2022.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 Sept 2022 |
| Application filed | 29 Sept 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sidhvi Infrastructure Projects Limited |
| Land area | 1.7 acres (0.7 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Chakirevulapalem |
| Taluk / tehsil | Rowthulapudi |
| District | Kakinada |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00174 |
In context
94 applications in Kakinada since January 2022 are in the same category (Mining): 64 approved, 11 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.7 acres, this one is smaller than 99% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 31 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 42 mining leases have applied within 5 km.
Where it is
Chakirevulapalem, Rowthulapudi, Kakinada, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Road Metal Mining Project of M/s. Sri Lakshmi Durga Stone Crusher — cleared for impact study, 150 m away
- Proposed Road Metal Mining Project of M/s. Sri Lakshmi Durga Stone Crusher — lapsed, 150 m away
- Mining project by M/s SK Terra Mines and Minerals LLP; Mg.P: Sri B. Swamy… — environmental approval granted, 150 m away
- Mining project by M/s SK Terra Mines and Minerals LLP; Mg.P: Sri B. Swamy… — cleared for impact study, 150 m away
- Mining project by M/s Sidhvi Infrastructures Projects Ltd- 2.120 Hects — cleared for impact study, 200 m away
- Proposed Road Metal Mining Project of Smt. Parepalli Anjali Devi — environmental approval granted, 200 m away
- Sri Kuchipudi Veera Babu Talluru — cleared for impact study, 450 m away
- Sri Kuchipudi Veera Babu Talluru — lapsed, 500 m away
More from Sidhvi Infrastructure Projects Limited in Kakinada
- Mining project by M/s Sidhvi Infrastructure Projects Ltd., Mg/D: Sri Ravi Babu… — more information requested
- Mining project by M/s Sidhvi Infrastructure Projects Limited — environmental approval granted
- Mining project by M/s Sidhvi Infrastructure Projects Limited — cleared for impact study
- Mining project by M/s Sidhvi Infrastructures Projects Ltd. -1.20 Hect., — cleared for impact study
- Mining project by M/s Sidhvi Infrastructures Projects Ltd- 2.120 Hects — cleared for impact study
All 6 Sidhvi Infrastructure Projects projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.