Quick answers
What is Industrial project by M/s. Trimurti Panel Products?
This approved industrial project by M/s. Trimurti Panel Products is in Maruvada, Ranastalam, Srikakulam, Andhra Pradesh. The site covers 3.6 acres.
Who is building it?
The applicant is Trimurti Panel Products.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Jul 2025), as of 27 Nov 2026.
Where is it?
In Maruvada, Ranastalam, Srikakulam, Andhra Pradesh.
How big is it?
It has a stated cost of ₹35 lakh and a site of 3.6 acres.
When was it filed?
The application was filed on 2 Jun 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Jul 2025 |
| Application filed | 2 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Trimurti Panel Products |
| Land area | 3.6 acres (1.5 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Maruvada |
| Taluk / tehsil | Ranastalam |
| District | Srikakulam |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03410 |
In context
6 applications in Srikakulam since January 2022 are in the same category (Industry): 5 approved, 1 filed or under review, and 0 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Maruvada, Ranastalam, Srikakulam, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Active Pharma Ingredients (Bulk Drug and Intermediates) Manufacturing Unit by… — coastal clearance granted, 4.1 km away
- Mining project by M/s GK Infra - 1.00 Hectares — environmental approval granted, 4.2 km away
- Mining project by M/s. Yashco Solutions Pvt. Ltd., — environmental approval granted, 4.2 km away
- Sri Gundu Kailasha Rao — environmental approval granted, 5.1 km away
- Greenfield steel plant comprising of 3 x 9 MVA Submerged Electric Arc Furnaces… — environmental approval granted, 5.5 km away
- Marine Environmental Impact Assessment Study for amendment of CRZ clearance to… — coastal clearance granted, 5.8 km away
- Diversion of 0.08 Ha of Forest Land for Laying of Pipeline to Draw Sea Water… — initial checks, 5.9 km away
- Diversion of 0.08 Ha of Forest Land for Laying of Pipeline to Draw Sea Water… — lapsed, 5.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.