Quick answers
What is this project?
Proposed Road Metal Mining Project of M/s. Sri Lakshmi Durga Stone Crusher is a proposed mining project in Santha Pydipala, Rowthulapudi, Kakinada, Andhra Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Jigireddy Sattibabu.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 8 Apr 2026), as of 27 Nov 2026.
Where is it?
In Santha Pydipala, Rowthulapudi, Kakinada, Andhra Pradesh.
How big is it?
It has a stated cost of ₹20 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 13 Feb 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 8 Apr 2026 |
| Application filed | 13 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Jigireddy Sattibabu |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Santha Pydipala |
| Taluk / tehsil | Rowthulapudi |
| District | Kakinada |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03644 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 13 Feb 2026 (this page) | Cleared for impact study | 2.5 acres | ₹20 lakh |
| New project filed 8 Dec 2025 | Lapsed | 2.5 acres | ₹20 lakh |
In context
94 applications in Kakinada since January 2022 are in the same category (Mining): 64 approved, 11 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.5 acres, this one is smaller than 96% of them.
7 other mining leases have applied within 500 m of this site; together with this one they cover 45.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 42 mining leases have applied within 5 km.
Where it is
Santha Pydipala, Rowthulapudi, Kakinada, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Road Metal Mining Project of M/s. Sri Lakshmi Durga Stone Crusher — lapsed, 0 m away
- Proposed Road Metal Mining Project of Smt. Parepalli Anjali Devi — environmental approval granted, 100 m away
- Sri Ravi Babu V.S Peddi Reddi — cleared for impact study, 150 m away
- Mining project by M/s Sidhvi Infrastructures Projects Ltd- 2.120 Hects — cleared for impact study, 150 m away
- Mining project by M/s SK Terra Mines and Minerals LLP; Mg.P: Sri B. Swamy… — environmental approval granted, 250 m away
- Mining project by M/s SK Terra Mines and Minerals LLP; Mg.P: Sri B. Swamy… — cleared for impact study, 250 m away
- Sri Kuchipudi Veera Babu Talluru — cleared for impact study, 350 m away
- Sri Kuchipudi Veera Babu Talluru — lapsed, 400 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.