What is Developing? Open the mapMap

Cleared for impact studyMining · Kakinada, Andhra Pradesh

Proposed Road Metal, Ballast & Building Stone, Gravel/Morrum & Ordinary Earth Project of M/s Satya Engineering & Constructions., 7.282 Ha.

Proposed Road Metal, Ballast & Building Stone, Gravel/Morrum & Ordinary Earth Project of M/s Satya Engineering & Constructions., 7.282 Ha is a proposed mining project in China Mallapuram, Sankhavaram, Kakinada, Andhra Pradesh. The site covers 18 acres. Its stated project cost is ₹80 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 27 Apr 2026).

See it on the live map All projects in Kakinada

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Road Metal, Ballast & Building Stone, Gravel/Morrum & Ordinary Earth Project of M/s Satya Engineering & Constructions., 7.282 Ha is a proposed mining project in China Mallapuram, Sankhavaram, Kakinada, Andhra Pradesh. The site covers 18 acres.

Who is building it?

The applicant is Ravikrishna Akula.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 27 Apr 2026), as of 27 Nov 2026.

Where is it?

In China Mallapuram, Sankhavaram, Kakinada, Andhra Pradesh.

How big is it?

It has a stated cost of ₹80 lakh and a site of 18 acres.

When was it filed?

The application was filed on 10 Mar 2026.

Project details

StatusCleared for impact study
Status since27 Apr 2026
Application filed10 Mar 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantRavikrishna Akula
Land area18 acres (7.3 ha)
Project cost₹80 lakh
Village / localityChina Mallapuram
Taluk / tehsilSankhavaram
DistrictKakinada
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-04070

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 29 Oct 2026Under environmental review18 acres₹80 lakh
Early planning filed 10 Mar 2026 (this page)Cleared for impact study18 acres₹80 lakh

In context

94 applications in Kakinada since January 2022 are in the same category (Mining): 64 approved, 11 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 18 acres, this one is larger than 90% of them.

No other mining lease on record is within 500 m of this site; 25 have applied within 5 km.

Where it is

China Mallapuram, Sankhavaram, Kakinada, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ravikrishna Akula in Kakinada

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.