Quick answers
What is this project?
This proposed mining project by M/s Nagarjuna Constructions Prop: Sri G.Nagarjuna is in Santapaidipala, Rowthulapudi, Kakinada, Andhra Pradesh. The site covers 12.2 acres.
Who is building it?
The applicant is Nagarjuna Ganesula.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Santapaidipala, Rowthulapudi, Kakinada, Andhra Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 12.2 acres.
When was it filed?
The application was filed on 12 Oct 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 24 Nov 2026 |
| Application filed | 12 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Nagarjuna Ganesula |
| Land area | 12.2 acres (5 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Santapaidipala |
| Taluk / tehsil | Rowthulapudi |
| District | Kakinada |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04439 |
In context
94 applications in Kakinada since January 2022 are in the same category (Mining): 64 approved, 11 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.2 acres, this one is larger than 79% of them.
No other mining lease on record is within 500 m of this site; 27 have applied within 5 km.
Where it is
Santapaidipala, Rowthulapudi, Kakinada, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri Choday Suresh — environmental approval granted, 1.4 km away
- Sri Choday Suresh — cleared for impact study, 1.4 km away
- Proposed Road Metal, Ballast & Building Stone, Gravel/Morrum & Ordinary Earth… — lapsed, 1.4 km away
- Mining project by M/s Sidhvi Infrastructure Projects Ltd., Mg/D: Sri Ravi Babu… — more information requested, 1.5 km away
- Proposed Road Metal, Ballast & Building Stone, Gravel/Morrum & Ordinary Earth… — under environmental review, 1.5 km away
- Proposed Road Metal, Ballast & Building Stone, Gravel/Morrum & Ordinary Earth… — cleared for impact study, 1.5 km away
- Mining project by M/s SK Terra Mines and Minerals LLP — cleared for impact study, 2.3 km away
- Sri S.Narayana Reddy (4.032 Ha) — cleared for impact study, 2.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.