Cleared for impact studyIndustry · Anantpur, Andhra Pradesh

Expansion–Sponge Iron-288750 TPA to1625250 TPA, IF with CCM-Hot Billets/MS Billets/Ingots-297000 to1782000 TPA,WHRB Power–22 to 157 MW,AFBC Power-16 to 66 MW, Rolling Mill -330000 to 2046000 TPA,New Gasifier (RM)-14,000 Nm3/hr, New SEAF–2 x 9 MVA (FeSi–14000TPA/FeMn–40000TPA/SiMn–28000TPA/FeCr–30000TPA/Pig Iron–48000 TPA),New Briquetting plant-200 Kg/Hr, Pellet Plant-600000 TPA, Gasifier(Pellet Plant)-21000 Nm3/hr, New Coal Washery DIR Grade–2160000 TPA, FlyAsh Bricks-33000 to 184300 Bricks/day

Expansion–Sponge Iron-288750 TPA to1625250 TPA, IF with CCM-Hot Billets/MS Billets/Ingots-297000 to1782000 TPA,WHRB Power–22 to 157 MW,AFBC Power-16 to 66 MW, Rolling Mill -330000 to 2046000 TPA,New Gasifier (RM)-14,000 Nm3/hr, New SEAF–2 x 9 MVA (FeSi–14000TPA/FeMn–40000TPA/SiMn–28000TPA/FeCr–30000TPA/Pig Iron–48000 TPA),New Briquetting plant-200 Kg/Hr, Pellet Plant-600000 TPA, Gasifier(Pellet Plant)-21000 Nm3/hr, New Coal Washery DIR Grade–2160000 TPA, FlyAsh Bricks-33000 to 184300 Bricks/day is a proposed industrial project in Bhogasamudram, Tadpatri, Anantpur, Andhra Pradesh. The site covers 331.1 acres. Its stated project cost is ₹3,516 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 19 Aug 2026).

See it on the live map All projects in Anantpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since19 Aug 2026
Application filed13 Aug 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantSugna Sponge and Power PVT LTD
Land area331.1 acres (134 ha)
Project cost₹3,516 crore
Village / localityBhogasamudram
Taluk / tehsilTadpatri
DistrictAnantpur
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-04138

In context

18 applications in Anantpur since January 2022 are in the same category (Industry): 11 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 331.1 acres, this one is larger than 50% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bhogasamudram, Tadpatri, Anantpur, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sugna Sponge and Power PVT LTD in Anantpur

All 4 Sugna Sponge and Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.