Quick answers
What is this project?
MULTI PHASE IT/ITES CAMPUS, NAMED PROJECT APEX, BY M/s COGNIZANT TECHNOLOGY SOLUTIONS INDIA PVT.LTD is an approved office project in Kapula Uppada, Bheemunipatnam, Visakhapatnam, Andhra Pradesh. It plans buildings of up to 13 floors on 22.2 acres.
Who is building it?
The applicant is Shaik Ismail.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Jun 2026), as of 27 Nov 2026.
Where is it?
In Kapula Uppada, Bheemunipatnam, Visakhapatnam, Andhra Pradesh.
How big is it?
It has a stated cost of ₹9,500 crore and a site of 22.2 acres.
When was it filed?
The application was filed on 29 Apr 2026.
Project details
| Official title | PROPOSED DEVELOPMENT OF A MULTI PHASE IT/ITES CAMPUS, NAMED PROJECT APEX, BY M/s COGNIZANT TECHNOLOGY SOLUTIONS INDIA PVT.LTD. |
|---|---|
| Status | Environmental approval granted |
| Status since | 5 Jun 2026 |
| Application filed | 29 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shaik Ismail |
| Use | IT / offices |
| Floors (tallest) | 13 |
| Basements | 4 |
| Land area | 22.2 acres (9 ha) |
| Built-up area | 1,48,490 m² (15,98,332 sq ft) |
| Plot area | 89,800 m² (9,66,598 sq ft) |
| Project cost | ₹9,500 crore |
| Village / locality | Kapula Uppada |
| Taluk / tehsil | Bheemunipatnam |
| District | Visakhapatnam |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04269 |
In context
89 applications in Visakhapatnam since January 2022 are in the same category (Buildings & townships): 64 approved, 11 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 22.2 acres, this one is larger than 74% of them.
40 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kapula Uppada, Bheemunipatnam, Visakhapatnam, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by M/s. Fluentgrid Limited — initial checks, 250 m away
- Building project by M/s. Dallas Technology Centre LLP — lapsed, 950 m away
- Building project by Nonrel Technologies Private Limited — environmental approval granted, 1.2 km away
- Building project by M/s. NCC VIZAG URBAN INFRASTRUCTURE LIMITED - Phase I — environmental approval granted, 1.2 km away
- Residential High rise building by M/s. V. K Infrastructures — environmental approval granted, 1.5 km away
- 'mvv Gv Leela Grand' — environmental approval granted, 1.8 km away
- Proposed Mixed Use Developing of IT/ITeS office Space and Residential Space by… — environmental approval granted, 2.2 km away
- Proposed Mixed Use Developing of IT/ITeS office Space and Residential Space by… — under environmental review, 2.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.