Quick answers
What is Road from ZP Road to Uppanapalligattu of Chinturu Mandal?
Road from ZP Road to Uppanapalligattu of Chinturu Mandal is a proposed road project in Uppenapallegattu, Chintur, Alluri Sitharama Raju, Andhra Pradesh. The site covers 8.5 acres.
Who is building it?
The applicant is Eepiukkd.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Uppenapallegattu, Chintur, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹4.6 crore; a site of 8.5 acres and 8.5 acres (3.4 ha) of forest land.
When was it filed?
The application was filed on 25 Apr 2023.
Project details
| Official title | Construction of road from ZP Road to Uppanapalligattu of Chinturu Mandal |
|---|---|
| Status | More information requested |
| Status since | 1 Sept 2023 |
| Application filed | 25 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Eepiukkd |
| Land area | 8.5 acres (3.4 ha) |
| Forest land | 8.5 acres (3.4 ha) |
| Project cost | ₹4.6 crore |
| Village / locality | Uppenapallegattu |
| Taluk / tehsil | Chintur |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04680 |
In context
23 applications in Alluri Sitharama Raju since January 2022 are in the same category (Roads & highways): 2 approved, 10 filed or under review, and 11 withdrawn, lapsed or rejected. At 8.5 acres, this one is smaller than 68% of them.
Where it is
Uppenapallegattu, Chintur, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Upgradation of the road from Sarivella to Latchigudem via Pega, Alligudem,… — more information requested, 8.3 km away
- L021-Road from Bhagavanpuram to Kotha karmankonda — initial checks, 9 km away
- Sri Ramavath Krishna Naik , Temporary permit for Mining of Road Metal and… — lapsed, 15.3 km away
- Temporary Permit for mining of Road Metal and Building Stone over an extent of… — environmental approval granted, 15.3 km away
- New BG line between Kothagudem-Kirandul — forest land use approved, 21.6 km away
- Gommu-Koyagudem/2022-23 Sand Reach — environmental approval granted, 21.7 km away
- Gommu-Koyagudem/2022-22 Sand Reach — environmental approval granted, 22.3 km away
- Gommu-Koyagudem/2022-21 Sand Reach — environmental approval granted, 22.7 km away
More from Eepiukkd in Alluri Sitharama Raju
- L021-Road from Bhagavanpuram to Kotha karmankonda — initial checks
- Upgradation of the road from Sarivella to Latchigudem via Pega, Alligudem,… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.