Quick answers
What is this project?
Temporary Permit for mining of Road Metal and Building Stone over an extent of 1.50Ha, Sri Ramavath Krishna Naik is an approved mining project in Ganganametta, Chintur, Alluri Sitharama Raju, Andhra Pradesh. The site covers 3.7 acres.
Who is building it?
The applicant is Sri Ramavath Krishna Naik.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Sept 2023), as of 27 Nov 2026.
Where is it?
In Ganganametta, Chintur, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹28 lakh and a site of 3.7 acres.
When was it filed?
The application was filed on 27 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Sept 2023 |
| Application filed | 27 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sri Ramavath Krishna Naik |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹28 lakh |
| Village / locality | Ganganametta |
| Taluk / tehsil | Chintur |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00394 |
In context
44 applications in Alluri Sitharama Raju since January 2022 are in the same category (Mining): 35 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.7 acres, this one is smaller than 93% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Ganganametta, Chintur, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri Ramavath Krishna Naik , Temporary permit for Mining of Road Metal and… — lapsed, 0 m away
- Widening to two-lane with paved shoulder of Chintoor to Motu Section of NH-326… — lapsed, 8 km away
- L021-Road from Bhagavanpuram to Kotha karmankonda — initial checks, 10.7 km away
- BSNL 4G Saturation Project- Staffordpeta, ASR District, Andhra Pradesh — forest land use approved, 14.3 km away
- Upgradation of the road from Sarivella to Latchigudem via Pega, Alligudem,… — more information requested, 15 km away
- Laying of Under Ground Optical Fibre Cable (OFC) between Mittavada-Chintur… — more information requested, 15.2 km away
- Laying of Under Ground Optical Fibre Cable (OFC) between Mittavada-Chintur… — lapsed, 15.2 km away
- Road from ZP Road to Uppanapalligattu of Chinturu Mandal — more information requested, 15.3 km away
More from Sri Ramavath Krishna Naik in Alluri Sitharama Raju
- Sri Ramavath Krishna Naik , Temporary permit for Mining of Road Metal and… — lapsed
- Sri Ramavath Krishna Naik — environmental approval granted
- Sri Ramavath Krishna Naik — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.