Quick answers
What is Chintalapudi Lift Irrigation Scheme?
Chintalapudi Lift Irrigation Scheme is a lapsed water and irrigation project in Nandigudem, Gopalapuram, East Godavari, Andhra Pradesh. The site covers 12 acres.
Who is building it?
The applicant is Superintendent Engineer, Pulichintala Project Circle,Vissannapeta.
Has it been approved?
No. The application was lapsed on 28 Oct 2026, so it is no longer under consideration.
Where is it?
In Nandigudem, Gopalapuram, East Godavari, Andhra Pradesh.
How big is it?
It has a stated cost of ₹1,906.5 crore; a site of 12 acres and 12 acres (4.9 ha) of forest land.
When was it filed?
The application was filed on 6 Aug 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Chintalapudi Lift Irrigation Scheme
Project details
| Status | Lapsed |
|---|---|
| Status since | 28 Oct 2026 |
| Application filed | 6 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Superintendent Engineer, Pulichintala Project Circle,Vissannapeta |
| Land area | 12 acres (4.9 ha) |
| Forest land | 12 acres (4.9 ha) |
| Project cost | ₹1,906.5 crore |
| Village / locality | Nandigudem |
| Taluk / tehsil | Gopalapuram |
| District | East Godavari |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04703 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Oct 2026 | In-principle approval, conditions pending | 12 acres | ₹8 lakh |
| New project filed 6 Aug 2026 (this page) | Lapsed | 12 acres | ₹1,906.5 crore |
In context
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nandigudem, Gopalapuram, East Godavari, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chintalapudi Lift Irrigation Scheme — in-principle approval, conditions pending, 0 m away
- Chintalapudi Lift Irrigation Scheme — lapsed, 1.9 km away
- Sri Koduri Venkata Ratnam — lapsed, 3.6 km away
- Sri Koduri Venkata Ratnam — cleared for impact study, 3.6 km away
- Sri. Koduri Venkata Ratnam — environmental approval granted, 3.7 km away
- Sri Koduri Venkata Ratnam — environmental approval granted, 3.7 km away
- Submission of No Increase in Pollution Load (NIPL) of M/s. Tibro… — initial checks, 9 km away
- Submission of No Increase in Pollution Load by M/s. Tagoor Laboratories… — initial checks, 9.4 km away
More from Superintendent Engineer, Pulichintala Project Circle,Vissannapeta in East Godavari
- Chintalapudi Lift Irrigation Scheme — lapsed
All 3 Superintendent Engineer, Pulichintala projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.