Quick answers
What is this project?
Road from O-R&b at Gullelu to Kandrangu (Kondru) of Pedabayalu mandal is a lapsed road project in Peddabayalu, Peda Bayalu, Alluri Sitharama Raju, Andhra Pradesh. The site covers 9.1 acres.
Who is building it?
The applicant is Executive Engineer PR Paderu.
Has it been approved?
No. The application was lapsed on 24 Aug 2023, so it is no longer under consideration.
Where is it?
In Peddabayalu, Peda Bayalu, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹15.9 crore; a site of 9.1 acres and 9 acres (3.7 ha) of forest land.
When was it filed?
The application was filed on 19 Apr 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Aug 2023 |
| Application filed | 19 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer PR Paderu |
| Land area | 9.1 acres (3.7 ha) |
| Forest land | 9 acres (3.7 ha) |
| Project cost | ₹15.9 crore |
| Village / locality | Peddabayalu |
| Taluk / tehsil | Peda Bayalu |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04809 |
In context
23 applications in Alluri Sitharama Raju since January 2022 are in the same category (Roads & highways): 2 approved, 10 filed or under review, and 11 withdrawn, lapsed or rejected. At 9.1 acres, this one is smaller than 64% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Peddabayalu, Peda Bayalu, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road From Maddigaruvu to Kandrangu — lapsed, 3.7 km away
- Laying of Iron Ore Pipeline for Pelletization Plant Through Forest Areas of… — in-principle approval, conditions pending, 21.4 km away
- Kum, Budimela Nookalamma — lapsed, 22.2 km away
- Sri Madakam Thamnna Dora — environmental approval granted, 23.6 km away
- Formation of Road from Laxmipuram to Padalaputtu of Munchingiputtu Mandal — lapsed, 25.4 km away
- Diversion of 16.29 Ha. Forest Land for Iron Ore Slurry Pipeline from Kirandul… — more information requested, 27.1 km away
- Road from Cherapalli to Panasapalli — lapsed, 28.7 km away
- Formation & BT to the road from Wangasara to Vamigedda Kotturu — lapsed, 30.5 km away
More from Executive Engineer PR Paderu in Alluri Sitharama Raju
- Road from China Agraharam to Marripakalu in G.K. Veedhi mandal — under forest review
- Road from Cherapalli to Panasapalli — lapsed
- Road from China Agraharam to Marripakalu in G.K. Veedhi mandal — lapsed
- Formation and Bt to the Road From P.Kothuru to Kothavedurupalem — more information requested
- Formation of Road from Laxmipuram to Padalaputtu of Munchingiputtu Mandal — lapsed
- Formation and Bt to the Road Including Construction of Culverts From P.Kothuru… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.