Quick answers
What is this project?
Formation of Road from Laxmipuram to Padalaputtu of Munchingiputtu Mandal is a lapsed road project in Gumma @ Digagumma, Munchingi Puttu, Alluri Sitharama Raju, Andhra Pradesh. The site covers 13.3 acres.
Who is building it?
The applicant is Executive Engineer PR Paderu.
Has it been approved?
No. The application was lapsed on 19 Nov 2024, so it is no longer under consideration.
Where is it?
In Gumma @ Digagumma, Munchingi Puttu, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹19.2 crore; a site of 13.3 acres and 13.2 acres (5.4 ha) of forest land.
When was it filed?
The application was filed on 25 Oct 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 19 Nov 2024 |
| Application filed | 25 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer PR Paderu |
| Land area | 13.3 acres (5.4 ha) |
| Forest land | 13.2 acres (5.4 ha) |
| Project cost | ₹19.2 crore |
| Village / locality | Gumma @ Digagumma |
| Taluk / tehsil | Munchingi Puttu |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04970 |
In context
23 applications in Alluri Sitharama Raju since January 2022 are in the same category (Roads & highways): 2 approved, 10 filed or under review, and 11 withdrawn, lapsed or rejected. At 13.3 acres, this one is larger than 68% of them.
Where it is
Gumma @ Digagumma, Munchingi Puttu, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s Sri Sri Sri Gangamma Thalli Stone Crusher — environmental approval granted, 10.9 km away
- Development of Water Aerodrome at Jalaput Lake, Andhra Pradesh — cleared for impact study, 15.1 km away
- Road from O-R&b at Gullelu to Kandrangu (Kondru) of Pedabayalu mandal — lapsed, 25.4 km away
- Road From Maddigaruvu to Kandrangu — lapsed, 28.9 km away
- Laying of Iron Ore Pipeline for Pelletization Plant Through Forest Areas of… — in-principle approval, conditions pending, 39.5 km away
- Kum, Budimela Nookalamma — lapsed, 44.3 km away
- Sri Madakam Thamnna Dora — environmental approval granted, 47.2 km away
- Diversion of 16.29 Ha. Forest Land for Iron Ore Slurry Pipeline from Kirandul… — more information requested, 52.5 km away
More from Executive Engineer PR Paderu in Alluri Sitharama Raju
- Road from China Agraharam to Marripakalu in G.K. Veedhi mandal — under forest review
- Road from Cherapalli to Panasapalli — lapsed
- Road from China Agraharam to Marripakalu in G.K. Veedhi mandal — lapsed
- Formation and Bt to the Road From P.Kothuru to Kothavedurupalem — more information requested
- Formation and Bt to the Road Including Construction of Culverts From P.Kothuru… — more information requested
- Formation & BT to the road from Wangasara to Vamigedda Kotturu — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.