Quick answers
What is this project?
Diversion of 2.33 ha. of forest land excavation of 960 MV of power from Polavaram Hydro Electric Project (Angaluru) – Execution of 400 Kv QMDC line from 400 Kv Polavaram Hydro Electric Project (Angaluru) to 400/220/11 Kv Guddigudam Substation in compartment no. 253 of Chaparaikonda & Pandurangametta (CA) RF of Polavaram Beat of Polavaram Range of Eluru division is a proposed power project in Polavaram, Eluru, Andhra Pradesh. The site covers 5.8 acres.
Who is building it?
The applicant is Transmission Corporation of Andhra Pradesh Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Polavaram, Eluru, Andhra Pradesh.
How big is it?
It has a stated cost of ₹130 crore; a site of 5.8 acres and 5.8 acres (2.3 ha) of forest land.
When was it filed?
The application was filed on 19 Mar 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 29 Oct 2026 |
| Application filed | 19 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Transmission Corporation of Andhra Pradesh Limited |
| Land area | 5.8 acres (2.3 ha) |
| Forest land | 5.8 acres (2.3 ha) |
| Project cost | ₹130 crore |
| Village / locality | Polavaram |
| Taluk / tehsil | Polavaram |
| District | Eluru |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04829 |
Where it is
Polavaram, Eluru, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4g Saturation Project_methapukota_eluru_ap — lapsed, 5.9 km away
- Bsnl 4g Saturation Project_methapukota_eluru_ap — decision issued, 5.9 km away
- Bsnl 4g Saturation Project_methapukota_eluru_ap — more information requested, 5.9 km away
- Sri Manapati Abbulu — environmental approval granted, 8.3 km away
- Bsnl 4g Saturation Project_udathapalli_eluru_ap — lapsed, 9.7 km away
- Bsnl 4g Saturation Project_udathapalli_eluru_ap — decision issued, 9.7 km away
- Chintalapudi Lift Irrigation Scheme — cleared for impact study, 14.3 km away
- Chintalapudi Lift Irrigation Scheme — under environmental review, 14.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.