Quick answers
What is Bsnl 4g Saturation Project_methapukota_eluru_ap?
Bsnl 4g Saturation Project_methapukota_eluru_ap is a proposed project in Chegondapalle, Polavaram, Eluru, Andhra Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Chegondapalle, Polavaram, Eluru, Andhra Pradesh.
How big is it?
It has a stated cost of ₹1 crore and a site of 0 acres.
When was it filed?
The application was filed on 3 Oct 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 3 Oct 2023 |
| Application filed | 3 Oct 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Chegondapalle |
| Taluk / tehsil | Polavaram |
| District | Eluru |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05036 |
In context
15 applications in Eluru since January 2022 are in the same category (Other): 0 approved, 9 filed or under review, and 3 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chegondapalle, Polavaram, Eluru, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4g Saturation Project_methapukota_eluru_ap — lapsed, 0 m away
- Bsnl 4g Saturation Project_methapukota_eluru_ap — decision issued, 0 m away
- Bsnl 4g Saturation Project_udathapalli_eluru_ap — lapsed, 3.8 km away
- Bsnl 4g Saturation Project_udathapalli_eluru_ap — decision issued, 3.8 km away
- Diversion of 2.33 ha. of forest land excavation of 960 MV of power from… — more information requested, 5.9 km away
- Sri Manapati Abbulu — environmental approval granted, 9.1 km away
- Bsnl 4g Saturation Project_tangedukonda_eluru_ap — under wildlife review, 10.8 km away
- Road from LND Peta to Gummuluru of Buttayagudem mandal — in-principle approval, conditions pending, 12 km away
More from Mahesh Nair in Eluru
- Bsnl 4g Saturation Project_chimaluru_eluru_ap — under wildlife review
- Bsnl 4g Saturation Project_ginnepalli_eluru_ap — under wildlife review
- Bsnl 4g Saturation Project_tangedukonda_eluru_ap — under wildlife review
- Bsnl 4g Saturation Project_chimaluru_eluru_ap — more information requested
- Bsnl 4g Saturation Project_modela_eluru_ap — under wildlife review
About this information