One of 2 filings for this project. The project's main page, with every filing and where each stands: Bsnl 4g Saturation Project _chennapalem_prakasam_andhrapradesh
Project details
| Status | More information requested |
|---|---|
| Status since | 30 Nov 2023 |
| Application filed | 30 Nov 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Chennapalem |
| Taluk / tehsil | Pullalacheruvu |
| District | Prakasam |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05045 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Nov 2023 (this page) | More information requested | 0 acres | ₹1 crore |
| New project filed 30 Nov 2023 | Forest land use approved | 0 acres | ₹1 crore |
In context
33 applications in Prakasam since January 2022 are in the same category (Other): 3 approved, 14 filed or under review, and 14 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chennapalem, Pullalacheruvu, Prakasam, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4g Saturation Project _chennapalem_prakasam_andhrapradesh — forest land use approved, 0 m away
- Bsnl 4g Saturation Project_chennapalem_prakasam_andhrapradesh — more information requested, 50 m away
- Bsnl 4g Saturation Project_chennapalem_prakasam_andhrapradesh — lapsed, 50 m away
- Bsnl 4g Saturation Project_chennapalem_prakasam_andhrapradesh — lapsed, 50 m away
- Diversion of 0.03 Ha of Forest Land for Construction of Mobile Tower for… — more information requested, 5.8 km away
- Diversion of 0.03 Ha of Forest Land for Construction of Mobile Tower for… — forest land use approved, 5.8 km away
- "rehabilitation and Up-Gradation of National Highway-565 From Km 133.922 to Km… — more information requested, 17.8 km away
- Bsnl Mobile Tower Under 4g Saturation Project at Murikimalla Thanda ,… — more information requested, 19.7 km away
More from Mahesh Nair in Prakasam
- Bsnl Mobile Tower Under 4g Saturation Project at Rollapenta , Korraprolu… — more information requested
- Bsnl Mobile Tower Under 4g Saturation Project at Istakameswari , Nekkanti… — lapsed
- Bsnl Mobile Tower Under 4g Saturation Project at Palutla , Ganjivaripalli… — lapsed
- Bsnl Mobile Tower Under 4g Saturation Project at Murikimalla Thanda ,… — more information requested
- Bsnl Mobile Tower Under 4g Saturation Project at Rollapenta , Korraprolu… — under wildlife review
- Bsnl Mobile Tower Under 4g Saturation Project at Istakameswari , Nekkanti… — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.