One of 2 filings for this project. The project's main page, with every filing and where each stands: Bsnl Mobile Tower Under 4g Saturation Project at Rollapenta , Korraprolu Range, Markapur…
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 29 Aug 2026 |
| Application filed | 29 Aug 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Rolla Penta |
| Taluk / tehsil | Dornala |
| District | Prakasam |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05119 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Aug 2026 (this page) | Under wildlife review | 0 acres | ₹1 crore |
| New project filed 29 Aug 2026 | More information requested | 0 acres | ₹1 crore |
In context
12 applications in Prakasam since January 2022 are in the same category (Telecom): 2 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
Where it is
Rolla Penta, Dornala, Prakasam, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl Mobile Tower Under 4g Saturation Project at Rollapenta , Korraprolu… — more information requested, 0 m away
- Diversion of 0.87 Ha of Forest Land for Construction of Mobile Tower for… — more information requested, 5.2 km away
- Diversion of 0.87 Ha of Forest Land for Construction of Mobile Tower for… — lapsed, 5.2 km away
- BSNL 4G SATURATION PROJECT_Peddamanthanala_PRAKASAM_ANDHRAPRADESH — decision issued, 7.5 km away
- BSNL 4G SATURATION PROJECT_Peddamanthanala_PRAKASAM_ANDHRAPRADESH — forest land use approved, 7.5 km away
- BSNL 4G SATURATION PROJECT_Ayynnakunta_PRAKASAM_ANDHRAPRADESH — lapsed, 7.6 km away
- BSNL 4G SATURATION PROJECT_Ayynnakunta_PRAKASAM_ANDHRAPRADESH — more information requested, 7.6 km away
- laying of Optical Fiber Cable along the Road within in the existing Right of… — lapsed, 7.7 km away
More from Mahesh Nair in Prakasam
- Bsnl Mobile Tower Under 4g Saturation Project at Istakameswari , Nekkanti… — lapsed
- Bsnl Mobile Tower Under 4g Saturation Project at Palutla , Ganjivaripalli… — lapsed
- Bsnl Mobile Tower Under 4g Saturation Project at Murikimalla Thanda ,… — more information requested
- Bsnl Mobile Tower Under 4g Saturation Project at Istakameswari , Nekkanti… — under wildlife review
- Bsnl Mobile Tower Under 4g Saturation Project at Palutla , Ganjivaripalli… — under wildlife review
- Bsnl Mobile Tower Under 4g Saturation Project at Murikimalla Thanda ,… — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.