Quick answers
What is Erection of 220 KV line from Lower Sileru to Bommuru?
Erection of 220 KV line from Lower Sileru to Bommuru is a proposed power project in Maredumilli, Alluri Sitharama Raju, Andhra Pradesh. The site covers 82.4 acres.
Who is building it?
The applicant is Executive Engineer.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Maredumilli, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹1 crore and a site of 82.4 acres.
When was it filed?
The application was filed on 21 Apr 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 21 Apr 2025 |
| Application filed | 21 Apr 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Power |
| Applicant | Executive Engineer |
| Land area | 82.4 acres (33.3 ha) |
| Project cost | ₹1 crore |
| Village / locality | Maredumilli |
| Taluk / tehsil | Maredumilli |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05099 |
Where it is
Maredumilli, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Under Ground Optical Fibre Cable (OFC) between Mittavada-Chintur… — more information requested, 17.8 km away
- Laying of Under Ground Optical Fibre Cable (OFC) between Mittavada-Chintur… — lapsed, 17.8 km away
- Road from Kakawada to Akuru — forest land use approved, 20.3 km away
- BSNL 4G Saturation Project- Staffordpeta, ASR District, Andhra Pradesh — forest land use approved, 20.7 km away
- BSNL 4G Saturation Project- Badigunta, ASR District, Andhra Pradesh — decision issued, 21.8 km away
- BSNL 4G Saturation Project- Badigunta, ASR District, Andhra Pradesh — forest land use approved, 21.8 km away
- Widening to two-lane with paved shoulder of Chintoor to Motu Section of NH-326… — lapsed, 25.2 km away
- Sri Ramavath Krishna Naik , Temporary permit for Mining of Road Metal and… — lapsed, 32.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.