Quick answers
What is this project?
BSNL 4G Saturation Project- Staffordpeta, ASR District, Andhra Pradesh is an approved project in Stafordpeta, Chintur, Alluri Sitharama Raju, Andhra Pradesh. The site covers 0.1 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 5 May 2025), as of 27 Nov 2026.
Where is it?
In Stafordpeta, Chintur, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹1 crore; a site of 0.1 acres and 340 m² of forest land.
When was it filed?
The application was filed on 29 Oct 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 5 May 2025 |
| Application filed | 29 Oct 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 300 m² |
| Forest land | 340 m² |
| Project cost | ₹1 crore |
| Village / locality | Stafordpeta |
| Taluk / tehsil | Chintur |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04841 |
In context
7 applications in Alluri Sitharama Raju since January 2022 are in the same category (Other): 3 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Stafordpeta, Chintur, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Under Ground Optical Fibre Cable (OFC) between Mittavada-Chintur… — more information requested, 3.7 km away
- Laying of Under Ground Optical Fibre Cable (OFC) between Mittavada-Chintur… — lapsed, 3.7 km away
- Widening to two-lane with paved shoulder of Chintoor to Motu Section of NH-326… — lapsed, 6.4 km away
- Sri Ramavath Krishna Naik , Temporary permit for Mining of Road Metal and… — lapsed, 14.3 km away
- Temporary Permit for mining of Road Metal and Building Stone over an extent of… — environmental approval granted, 14.3 km away
- Erection of 220 KV line from Lower Sileru to Bommuru — more information requested, 20.7 km away
- L021-Road from Bhagavanpuram to Kotha karmankonda — initial checks, 22.3 km away
- Upgradation of the road from Sarivella to Latchigudem via Pega, Alligudem,… — more information requested, 29.1 km away
More from Mahesh Nair in Alluri Sitharama Raju
- BSNL 4G Saturation Project- Badigunta, ASR District, Andhra Pradesh — decision issued
- BSNL 4G Saturation Project- Badigunta, ASR District, Andhra Pradesh — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.