One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 0.57 Ha of Forest Land and 3.30 ha of Non-Forest Land for laying of Optical…
Project details
| Status | Application filed |
|---|---|
| Status since | 18 May 2026 |
| Application filed | 18 May 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Bharti Airtel Limited |
| Land area | 9.6 acres (3.9 ha) |
| Project cost | ₹33 lakh |
| Village / locality | Alladapalle |
| Taluk / tehsil | Chapad |
| District | Y.S.R. |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05104 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 May 2026 (this page) | Application filed | 9.6 acres | ₹33 lakh |
| New project filed 18 May 2026 | Initial checks | 9.6 acres | ₹33 lakh |
In context
19 applications in Y.S.R. since January 2022 are in the same category (Roads & highways): 6 approved, 6 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 21 months from filing to approval. At 9.6 acres, this one is smaller than 65% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Alladapalle, Chapad, Y.S.R., Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.57 Ha of Forest Land and 3.30 ha of Non-Forest Land for laying… — initial checks, 0 m away
- Express ways, Economic Corridors and inter corridors under Bharatmala… — forest land use approved, 1.6 km away
- M/S Dilip Buildcon Limited, Temporary Permit Applied Area for Mining of Road… — environmental approval granted, 6.4 km away
- Temporary Permit for Road Metal and Building Stone, 3.950 Ha (M/s Dilip… — environmental approval granted, 6.4 km away
- Mining project by M/s Mount Vista Private Limited, - 1.00 ha — environmental approval granted, 6.4 km away
- M/s. Megha Engineering & Infrastructures Ltd, - Road Metal and Building Stone… — lapsed, 7.1 km away
- Mining project by M/s. Megha Engineering & Infrastructures Ltd, - 4.900 Ha. — lapsed, 7.1 km away
- Sri. C.Seetharami Reddy, Road Metal & Building Stone -3.00Ha — environmental approval granted, 7.9 km away
More from Bharti Airtel Limited in Y.S.R.
- Diversion of 0.42 Ha of Forest Land for laying of Optical Fiber Cable along… — application filed
- Diversion of 0.42 Ha of Forest Land for laying of Optical Fiber Cable along… — initial checks
- Diversion of 0.99 Ha of Forest Land and (0.55 Ha of Non Forest Land total:… — lapsed
- Laying underground OFC along the road between "Badvel-Dornala T Junction… — lapsed
6 Bharti Airtel (Airtel) projects in Y.S.R.
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.