Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Aug 2025 |
| Application filed | 29 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Yerragondu Nithyananda Reddy |
| Land area | 12.1 acres (4.9 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Palugurallapalle |
| Taluk / tehsil | Brahmamgarimattam |
| District | Y.S.R. |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02348 |
In context
139 applications in Y.S.R. since January 2022 are in the same category (Mining): 106 approved, 8 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.1 acres, this one is smaller than 55% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Palugurallapalle, Brahmamgarimattam, Y.S.R., Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s. Megha Engineering & Infrastructures Ltd, - Road Metal and Building Stone… — lapsed, 0 m away
- Sri. C.Seetharami Reddy, Road Metal & Building Stone -3.00Ha — environmental approval granted, 2.4 km away
- Mining project by M/s. APMDC - Barytes in 24.50 ha, Production@ 6075 TPA — environmental approval granted, 4.9 km away
- Mining project by M/s. APMDC - Barytes in 24.50 ha, Production@ 6075 TPA — cleared for impact study, 4.9 km away
- Express ways, Economic Corridors and inter corridors under Bharatmala… — forest land use approved, 5.6 km away
- Mining project by M/s I. Sringeri Mines & Minerals Mg Ptr: Sri I. Venkata… — environmental approval granted, 5.9 km away
- Diversion of 0.57 Ha of Forest Land and 3.30 ha of Non-Forest Land for laying… — initial checks, 7.1 km away
- Diversion of 0.57 Ha of Forest Land and 3.30 ha of Non-Forest Land for laying… — application filed, 7.1 km away
More from Yerragondu Nithyananda Reddy in Y.S.R.
- M/s. Megha Engineering & Infrastructures Ltd, - Road Metal and Building Stone… — lapsed
- M/s. Megha Engineering & Infrastructures Ltd, -Road Metal and Building Stone… — lapsed
- Mining project by M/s. Megha Engineering & Infrastructures Ltd., - 2.000 Ha. — lapsed
- M/s. Megha Engineering & Infrastructures Ltd - ROAD METAL AND BUILDING STONE -… — lapsed
- M/S MEGHA ENGINEERING AND INFRASTUCTURES LTD - Road Metal and Building stone — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.