Quick answers
What is this project?
Development of Fishing Harbour At Budagatlapalem Village, Srikakulam District, Andhra Pradesh is a lapsed building project in Na, Ranastalam, Srikakulam, Andhra Pradesh. The site covers 19.8 acres.
Who is building it?
The applicant is Andhra Pradesh Maritime Board.
Has it been approved?
No. The application was lapsed on 26 Oct 2025, so it is no longer under consideration.
Where is it?
In Na, Ranastalam, Srikakulam, Andhra Pradesh.
How big is it?
It has a stated cost of ₹125 crore and a site of 19.8 acres.
When was it filed?
The application was filed on 5 Aug 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Oct 2025 |
| Application filed | 5 Aug 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Andhra Pradesh Maritime Board |
| Land area | 19.8 acres (8 ha) |
| Project cost | ₹125 crore |
| Village / locality | Na |
| Taluk / tehsil | Ranastalam |
| District | Srikakulam |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05226 |
In context
13 applications in Srikakulam since January 2022 are in the same category (Buildings & townships): 3 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. At 19.8 acres, this one is smaller than 85% of them.
Where it is
Na, Ranastalam, Srikakulam, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.08 Ha of Forest Land for Laying of Pipeline to Draw Sea Water… — initial checks, 6.1 km away
- Diversion of 0.08 Ha of Forest Land for Laying of Pipeline to Draw Sea Water… — lapsed, 6.1 km away
- Diversion of Forest Land for approach road to R & R Colony in Comp No – 138 of… — more information requested, 11.2 km away
- Industrial project by M/s. Trimurti Panel Products — environmental approval granted, 11.7 km away
- Proposed to Change in Product by Retaining Daily Production Capacity of 70.1… — initial checks, 13.2 km away
- Proposed Change in Product Mix within exisitng site with No Increase in… — initial checks, 13.2 km away
- Active Pharma Ingredients (Bulk Drug and Intermediates) Manufacturing Unit by… — coastal clearance granted, 14.5 km away
- Muddadapeta Sand Reach — environmental approval granted, 15.1 km away
All 3 Andhra Pradesh Maritime Board projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.