Quick answers
What is this project?
Proposed 2 x 21 MVA Ferro Alloy Plant (38,000 TPA Fe-Si) at Plot no. 20, 21, 33, 34, 45, Industrial Growth Centre, Niglok-Ngorlung, District East Siang, Arunachal Pradesh by M/s Alloycraft Industries LLP is a proposed industrial project in Ngorlung, Ruksin Adc, East Siang, Arunachal Pradesh. The site covers 34.9 acres.
Who is building it?
The applicant is Alloycraft Industries LLP.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Feb 2025), as of 27 Nov 2026.
Where is it?
In Ngorlung, Ruksin Adc, East Siang, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹227 crore and a site of 34.9 acres.
When was it filed?
The application was filed on 28 Jan 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 6 Feb 2025 |
| Application filed | 28 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Alloycraft Industries LLP |
| Land area | 34.9 acres (14.1 ha) |
| Project cost | ₹227 crore |
| Village / locality | Ngorlung |
| Taluk / tehsil | Ruksin Adc |
| District | East Siang |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00031 |
Where it is
Ngorlung, Ruksin Adc, East Siang, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening & Up-gradation of NH 515 from 2-Lane to 4-Lane with Paved Shoulder… — forest land use approved, 5.9 km away
- C/o 70R loading capacity bridge over Sibo Korong in Pasighat — lapsed, 22.5 km away
- 400 kV Kaying Niglok D/C Transmission Line in the State of Arunachal Pradesh — under forest review, 47.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.