What is Developing? Open the mapMap

LapsedRoads & highways · East Siang, Arunachal Pradesh

C/o 70R loading capacity bridge over Sibo Korong in Pasighat

C/o 70R loading capacity bridge over Sibo Korong in Pasighat is a lapsed road project in Ranaghat, Mebo Adc, East Siang, Arunachal Pradesh. The site covers 0.2 acres. Its stated project cost is ₹47.7 crore. As of 27 Nov 2026, its status is “Lapsed” (since 21 Oct 2026).

See it on the live map All projects in East Siang

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is C/o 70R loading capacity bridge over Sibo Korong in Pasighat?

C/o 70R loading capacity bridge over Sibo Korong in Pasighat is a lapsed road project in Ranaghat, Mebo Adc, East Siang, Arunachal Pradesh. The site covers 0.2 acres.

Who is building it?

The applicant is PWD, Pasighat Division.

Has it been approved?

No. The application was lapsed on 21 Oct 2026, so it is no longer under consideration.

Where is it?

In Ranaghat, Mebo Adc, East Siang, Arunachal Pradesh.

How big is it?

It has a stated cost of ₹47.7 crore; a site of 0.2 acres and 900 m² of forest land.

When was it filed?

The application was filed on 7 Sept 2026.

Project details

Official titleC/o 70R loading capacity bridge over Sibo Korong in Pasighat in East Siang District of Arunachal Pradesh (Span 90m) under CRIF SETU BANDHAN
StatusLapsed
Status since21 Oct 2026
Application filed7 Sept 2026
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantPWD, Pasighat Division
Land area900 m²
Forest land900 m²
Project cost₹47.7 crore
Village / localityRanaghat
Taluk / tehsilMebo Adc
DistrictEast Siang
StateArunachal Pradesh
Location fromSite boundary on record
Our referenceWID-AR-00251

Where it is

Ranaghat, Mebo Adc, East Siang, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.