Quick answers
What is this project?
Diversion of 0.1092 ha of forest land for Construction of Arun Rang Manch (Auditorium-cum-Theater) behind Dorjee Khandu State Convention Hall, Itanagar, Papum Pare District of Arunachal Pradesh is a lapsed project in Daria Puru, Itanagar Eac, Papum Pare, Arunachal Pradesh. The site covers 0.3 acres.
Who is building it?
The applicant is Tem Kaya.
Has it been approved?
No. The application was lapsed on 7 Aug 2025, so it is no longer under consideration.
Where is it?
In Daria Puru, Itanagar Eac, Papum Pare, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹5 crore; a site of 0.3 acres and 1,090 m² of forest land.
When was it filed?
The application was filed on 22 Jan 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 0.1092 ha of forest land for Construction of Arun Rang Manch…
Project details
| Official title | Proposal for diversion of 0.1092 ha of forest land for Construction of Arun Rang Manch (Auditorium-cum-Theater) behind Dorjee Khandu State Convention Hall, Itanagar, Papum Pare District of Arunachal Pradesh |
|---|---|
| Status | Lapsed |
| Status since | 7 Aug 2025 |
| Application filed | 22 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Tem Kaya |
| Land area | 1,100 m² |
| Forest land | 1,090 m² |
| Project cost | ₹5 crore |
| Village / locality | Daria Puru |
| Taluk / tehsil | Itanagar Eac |
| District | Papum Pare |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00055 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Jan 2024 | Decision issued | 0.3 acres | ₹5 crore |
| New project filed 22 Jan 2024 (this page) | Lapsed | 0.3 acres | ₹5 crore |
In context
6 applications in Papum Pare since January 2022 are in the same category (Other): 0 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Daria Puru, Itanagar Eac, Papum Pare, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.1092 ha of forest land for Construction of Arun Rang Manch… — decision issued, 0 m away
- Diversion of 20.421 Ha of Forest Land for Widening/Improvement of Four Lanning… — under forest review, 2.4 km away
- Diversion of 20.421 Ha of Forest Land for Widening/Improvement of Four Lanning… — more information requested, 2.4 km away
- Diversion of Forest Land for Office Infrastructure of Geological Survey of… — under forest review, 2.5 km away
- Geological Survey of India, SU: Arunachal Pradesh — not approved, 2.6 km away
- "Diversion of forest land of 0.234 ha. for access to Govt. Secondary School,… — lapsed, 3.1 km away
- Diversion of 0.0013 Ha of Forest Land for Establishment of Petrol Pump at… — lapsed, 3.9 km away
- Diversion of forest land measuring 0.80 Ha for construction of RT Station for… — under wildlife review, 4.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.