Quick answers
What is this project?
Diversion of 20.421 Ha of Forest Land for Widening/Improvement of Four Lanning of NH-415 From Design Chainage 29.500 Km to 40.440 Km (Police Hq to Pappu Nallah) Itanagar to Banderdewa Section in the State of Arunachal Pradesh Under Annual Plan 2016-17 on Epc Mode (Package A) Length 10.09 Km is a proposed public facility in Papu Nalah To E/Gate, Itanagar Eac, Papum Pare, Arunachal Pradesh. The site covers 50.5 acres.
Who is building it?
The applicant is Arunachal Pwd Highway.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Papu Nalah To E/Gate, Itanagar Eac, Papum Pare, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹341.8 crore and a site of 50.5 acres.
When was it filed?
The application was filed on 26 Oct 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 20.421 Ha of Forest Land for Widening/Improvement of Four Lanning of NH-415…
Project details
| Official title | Proposal for Diversion of 20.421 Ha of Forest Land for Widening/Improvement of Four Lanning of NH-415 From Design Chainage 29.500 Km to 40.440 Km (Police Hq to Pappu Nallah) Itanagar to Banderdewa Section in the State of Arunachal Pradesh Under Annual Plan 2016-17 on Epc Mode (Package A) Length 10.09 Km. |
|---|---|
| Status | More information requested |
| Status since | 26 Oct 2023 |
| Application filed | 26 Oct 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Public facilities |
| Applicant | Arunachal Pwd Highway |
| Land area | 50.5 acres (20.4 ha) |
| Project cost | ₹341.8 crore |
| Village / locality | Papu Nalah To E/Gate |
| Taluk / tehsil | Itanagar Eac |
| District | Papum Pare |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00268 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Jan 2024 | Under forest review | 50.5 acres | ₹341.8 crore |
| New project filed 26 Oct 2023 (this page) | More information requested | 50.5 acres | ₹341.8 crore |
In context
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Papu Nalah To E/Gate, Itanagar Eac, Papum Pare, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 20.421 Ha of Forest Land for Widening/Improvement of Four Lanning… — under forest review, 0 m away
- Diversion of 0.1092 ha of forest land for Construction of Arun Rang Manch… — decision issued, 2.4 km away
- Diversion of 0.1092 ha of forest land for Construction of Arun Rang Manch… — lapsed, 2.4 km away
- Diversion of Forest Land for Office Infrastructure of Geological Survey of… — under forest review, 4.9 km away
- Geological Survey of India, SU: Arunachal Pradesh — not approved, 4.9 km away
- Diversion of 0.0013 Ha of Forest Land for Establishment of Petrol Pump at… — lapsed, 5.2 km away
- Diversion of 0.0916 ha of forest lend for Establishment of Hindustan Petroleum… — under wildlife review, 5.4 km away
- Diversion of 0.0916 ha of forest lend for Establishment of Hindustan Petroleum… — in-principle approval, conditions pending, 5.4 km away
More from Arunachal Pwd Highway in Papum Pare
- Diversion of 1.65 Ha of Forest Land for Construction of Toll Plaza Ot NH-415… — initial checks
- Diversion of 1.65 Ha of Forest Land for Construction of Toll Plaza Ot NH-415… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.