One of 3 filings for this project. The project's main page, with every filing and where each stands: Taksing Ghora Camp- Lung OP ICBR-II road in the State of Arunachal Pradesh along…
Project details
| Official title | Construction of Taksing Ghora Camp- Lung OP ICBR-II road in the State of Arunachal Pradesh along Indo-China Border ( Length-6.515 Km) |
|---|---|
| Status | Lapsed |
| Status since | 7 Mar 2024 |
| Application filed | 4 Nov 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | 128 Rcc (Bro) |
| Land area | 43.6 acres (17.6 ha) |
| Forest land | 43.6 acres (17.6 ha) |
| Project cost | ₹46.6 crore |
| Village / locality | Na |
| Taluk / tehsil | Taksing |
| District | Upper Subansiri |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00136 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Nov 2023 | In-principle approval, conditions pending | 43.6 acres | ₹46.6 crore |
| New project filed 4 Nov 2023 (this page) | Lapsed | 43.6 acres | ₹46.6 crore |
| New project filed 4 Nov 2023 | Lapsed | 43.6 acres | ₹46.6 crore |
In context
8 applications in Upper Subansiri since January 2022 are in the same category (Roads & highways): 0 approved, 3 filed or under review, and 5 withdrawn, lapsed or rejected.
Where it is
Na, Taksing, Upper Subansiri, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Taksing Ghora Camp- Lung OP ICBR-II road in the State of Arunachal Pradesh… — lapsed, 0 m away
- Taksing Ghora Camp- Lung OP ICBR-II road in the State of Arunachal Pradesh… — in-principle approval, conditions pending, 150 m away
- Oju Hydroelectric Project of capacity 2220 MW by M/s Oju Subansiri Hydro Power… — initial checks, 22.3 km away
- Oju HEP — lapsed, 22.5 km away
- Oju Hydroelectric Project of capacity 2220 MW by M/s Oju Subansiri Hydro Power… — lapsed, 22.5 km away
- Oju Hydroelectric Project of capacity 2220 MW by M/s Oju Subansiri Hydro Power… — more information requested, 22.5 km away
- Oju HEP — cleared for impact study, 22.5 km away
- Niare Hydro Electric Project (909 MW) — under environmental review, 35.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.