Project details
| Official title | Construction of Taksing Ghora Camp- Lung OP ICBR-II road in the State of Arunachal Pradesh along Indo-China Border ( Length-6.515 Km) |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 6 May 2026 |
| Application filed | 16 Nov 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | 128 Rcc (Bro) |
| Land area | 43.6 acres (17.6 ha) |
| Forest land | 43.6 acres (17.6 ha) |
| Project cost | ₹46.6 crore |
| Village / locality | Na |
| Taluk / tehsil | Taksing |
| District | Upper Subansiri |
| State | Arunachal Pradesh |
| Location from | Site area on record |
| Our reference | WID-AR-00248 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Nov 2023 (this page) | In-principle approval, conditions pending | 43.6 acres | ₹46.6 crore |
| New project filed 4 Nov 2023 | Lapsed | 43.6 acres | ₹46.6 crore |
| New project filed 4 Nov 2023 | Lapsed | 43.6 acres | ₹46.6 crore |
In context
8 applications in Upper Subansiri since January 2022 are in the same category (Roads & highways): 0 approved, 3 filed or under review, and 5 withdrawn, lapsed or rejected.
Where it is
Na, Taksing, Upper Subansiri, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Taksing Ghora Camp- Lung OP ICBR-II road in the State of Arunachal Pradesh… — lapsed, 150 m away
- Taksing Ghora Camp- Lung OP ICBR-II road in the State of Arunachal Pradesh… — lapsed, 150 m away
- Oju Hydroelectric Project of capacity 2220 MW by M/s Oju Subansiri Hydro Power… — initial checks, 22.5 km away
- Oju HEP — lapsed, 22.6 km away
- Oju Hydroelectric Project of capacity 2220 MW by M/s Oju Subansiri Hydro Power… — lapsed, 22.6 km away
- Oju Hydroelectric Project of capacity 2220 MW by M/s Oju Subansiri Hydro Power… — more information requested, 22.6 km away
- Oju HEP — cleared for impact study, 22.6 km away
- Niare Hydro Electric Project (909 MW) — under environmental review, 35.5 km away