What is Developing? Open the mapMap

Under forest reviewWater & irrigation · Upper Subansiri, Arunachal Pradesh

Niare Hydroelectric Project (909 MW)

Niare Hydroelectric Project (909 MW) is a proposed water and irrigation project in Bodok, Limeking Circle, Upper Subansiri, Arunachal Pradesh. The site covers 432.6 acres. Its stated project cost is ₹77.3 crore. As of 27 Nov 2026, its status is “Under forest review” (since 21 Apr 2026).

See it on the live map All projects in Upper Subansiri

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusUnder forest review
Status since21 Apr 2026
Application filed26 Nov 2025
Approval soughtForest land use
Application typeNew project
SectorWater & irrigation
ApplicantAndra Power Private Limited
Land area432.6 acres (175.1 ha)
Forest land432.6 acres (175.1 ha)
Project cost₹77.3 crore
Village / localityBodok
Taluk / tehsilLimeking Circle
DistrictUpper Subansiri
StateArunachal Pradesh
Location fromSite boundary on record
Our referenceWID-AR-00178

In context

9 applications in Upper Subansiri since January 2022 are in the same category (Water & irrigation): 2 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bodok, Limeking Circle, Upper Subansiri, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Andra Power Private Limited in Upper Subansiri

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.