What is Developing? Open the mapMap

More information requestedWater & irrigation · Upper Subansiri, Arunachal Pradesh

Diversion of 11.222 Ha Forest Land for Construction of Mosi Shp (3x2.0 MW)

Diversion of 11.222 Ha Forest Land for Construction of Mosi Shp (3x2.0 MW) is a proposed water and irrigation project in Sippi, Daporijo Hq, Upper Subansiri, Arunachal Pradesh. The site covers 27.7 acres. Its stated project cost is ₹90.4 crore. As of 27 Nov 2026, its status is “More information requested” (since 9 Nov 2026).

See it on the live map All projects in Upper Subansiri

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleProposal for Diversion of 11.222 Ha Forest Land for Construction of Mosi Shp (3x2.0 MW) in Upper Subansiri District of Arunachal Pradesh.
StatusMore information requested
Status since9 Nov 2026
Application filed10 Sept 2024
Approval soughtForest land use
Application typeNew project
SectorWater & irrigation
ApplicantTam Mugli
Land area27.7 acres (11.2 ha)
Forest land27.7 acres (11.2 ha)
Project cost₹90.4 crore
Village / localitySippi
Taluk / tehsilDaporijo Hq
DistrictUpper Subansiri
StateArunachal Pradesh
Location fromSite boundary on record
Our referenceWID-AR-00199

In context

9 applications in Upper Subansiri since January 2022 are in the same category (Water & irrigation): 2 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected.

Where it is

Sippi, Daporijo Hq, Upper Subansiri, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.