Project details
| Official title | Proposal for Diversion of 11.222 Ha Forest Land for Construction of Mosi Shp (3x2.0 MW) in Upper Subansiri District of Arunachal Pradesh. |
|---|---|
| Status | More information requested |
| Status since | 9 Nov 2026 |
| Application filed | 10 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Tam Mugli |
| Land area | 27.7 acres (11.2 ha) |
| Forest land | 27.7 acres (11.2 ha) |
| Project cost | ₹90.4 crore |
| Village / locality | Sippi |
| Taluk / tehsil | Daporijo Hq |
| District | Upper Subansiri |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00199 |
In context
9 applications in Upper Subansiri since January 2022 are in the same category (Water & irrigation): 2 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected.
Where it is
Sippi, Daporijo Hq, Upper Subansiri, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Subansiri Upper HE Project — more information requested, 19.6 km away
- Subansiri Upper HE Project — more information requested, 19.6 km away
- Subansiri Upper HE Project — lapsed, 19.6 km away
- Subansiri Upper HE Project — cleared for impact study, 19.6 km away
- Taliha Graphite Deposit — under forest review, 21.4 km away
- Taliha Graphite Deposit over an area 496 ha — lapsed, 21.4 km away
- Laa-Lamdak Graphite Deposit in Kamle District , Arunachal Pradesh — lapsed, 25 km away
- Laa-Lamdak Graphite Deposit in Kamle District , Arunachal Pradesh — not approved, 25 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.