What is Developing? Open the mapMap

Cleared for impact studyIndustry · Cachar, Assam

Environmental Clearance for Setting Up the Greenfield Plant for Production of 90,000tpa Tmt Bars Or Ms Re-Rolled Products by Installing Rolling Mill of 300tpd Capacity

Environmental Clearance for Setting Up the Greenfield Plant for Production of 90,000tpa Tmt Bars Or Ms Re-Rolled Products by Installing Rolling Mill of 300tpd Capacity is a proposed industrial project in Pangram - I, Silchar, Cachar, Assam. The site covers 7.8 acres. Its stated project cost is ₹39 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 16 Nov 2022).

See it on the live map All projects in Cachar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Environmental Clearance for Setting Up the Greenfield Plant for Production of 90,000tpa Tmt Bars Or Ms Re-Rolled Products by Installing Rolling Mill of 300tpd Capacity is a proposed industrial project in Pangram - I, Silchar, Cachar, Assam. The site covers 7.8 acres.

Who is building it?

The applicant is Irid Casting Works LLP.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 16 Nov 2022), as of 27 Nov 2026.

Where is it?

In Pangram - I, Silchar, Cachar, Assam.

How big is it?

It has a stated cost of ₹39 crore and a site of 7.8 acres.

When was it filed?

The application was filed on 16 Nov 2022.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance for Setting Up the Greenfield Plant for Production of 90,000tpa…

Project details

Official titleEnvironmental Clearance for Setting Up the Greenfield Plant for Production of 90,000tpa Tmt Bars Or Ms Re-Rolled Products by Installing Rolling Mill of 300tpd Capacity Along With Reheating Furnace (Coal Based) of Avg. Capacity Between 15-18tph by M/S Irid Casting Works LLP at Village – Pangram Part-I, P.O. Udharbond Dist. Cachar, Assam.
StatusCleared for impact study
Status since16 Nov 2022
Application filed16 Nov 2022
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantIrid Casting Works LLP
Land area7.8 acres (3.2 ha)
Project cost₹39 crore
Village / localityPangram - I
Taluk / tehsilSilchar
DistrictCachar
StateAssam
Location fromSite boundary on record
Our referenceWID-AS-00044

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 28 Mar 2024Environmental approval granted11.2 acres₹39 crore
Early planning filed 16 Nov 2022 (this page)Cleared for impact study7.8 acres₹39 crore

In context

12 applications in Cachar since January 2022 are in the same category (Industry): 10 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected. At 7.8 acres, this one is smaller than 58% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Pangram - I, Silchar, Cachar, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.