Quick answers
What is this project?
Environmental Clearance for Setting Up the Greenfield Plant for Production of 90,000tpa Tmt Bars Or Ms Re-Rolled Products by Installing Rolling Mill of 300tpd Capacity is a proposed industrial project in Pangram - I, Silchar, Cachar, Assam. The site covers 7.8 acres.
Who is building it?
The applicant is Irid Casting Works LLP.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 16 Nov 2022), as of 27 Nov 2026.
Where is it?
In Pangram - I, Silchar, Cachar, Assam.
How big is it?
It has a stated cost of ₹39 crore and a site of 7.8 acres.
When was it filed?
The application was filed on 16 Nov 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance for Setting Up the Greenfield Plant for Production of 90,000tpa…
Project details
| Official title | Environmental Clearance for Setting Up the Greenfield Plant for Production of 90,000tpa Tmt Bars Or Ms Re-Rolled Products by Installing Rolling Mill of 300tpd Capacity Along With Reheating Furnace (Coal Based) of Avg. Capacity Between 15-18tph by M/S Irid Casting Works LLP at Village – Pangram Part-I, P.O. Udharbond Dist. Cachar, Assam. |
|---|---|
| Status | Cleared for impact study |
| Status since | 16 Nov 2022 |
| Application filed | 16 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Irid Casting Works LLP |
| Land area | 7.8 acres (3.2 ha) |
| Project cost | ₹39 crore |
| Village / locality | Pangram - I |
| Taluk / tehsil | Silchar |
| District | Cachar |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00044 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 Mar 2024 | Environmental approval granted | 11.2 acres | ₹39 crore |
| Early planning filed 16 Nov 2022 (this page) | Cleared for impact study | 7.8 acres | ₹39 crore |
In context
12 applications in Cachar since January 2022 are in the same category (Industry): 10 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected. At 7.8 acres, this one is smaller than 58% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pangram - I, Silchar, Cachar, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential cum Commercial Project by ASSAM Progressive Developers Limited — environmental approval granted, 1.6 km away
- Extraction of Ordinary Clay From Outside Barak River (Near Udayan Singha Play… — environmental approval granted, 1.7 km away
- Sahebghat Minor Mineral Unit-1 (Gravel) — environmental approval granted, 2.5 km away
- Mazumdar Bazar Minir Mineral Unit-1 (Sand) on Barak River Bed — environmental approval granted, 4 km away
- Dhamalia Village Minor Mineral (Sand) Mining Permit Area — environmental approval granted, 4.9 km away
- Superspeciality Hospital Wing at Silchar Medical College & Hospital Under… — environmental approval granted, 6.4 km away
- Ambikapur Pt. IV (Budhhurail) Ordinary Earth Mining Permit Area — environmental approval granted, 6.8 km away
- Dudpatil Grant P.P. Land Ordinary Earth Mining Permit Area — environmental approval granted, 9.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.