Quick answers
What is this project?
Environmental Clearance for Setting Up the Greenfield Plant for Production of 90,000tpa Tmt Bars Or Ms Re-Rolled Products by Installing Rolling Mill of 300tpd Capacity is an approved industrial project in Pangram - I, Silchar, Cachar, Assam. The site covers 11.2 acres.
Who is building it?
The applicant is Irid Casting Works LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Feb 2025), as of 27 Nov 2026.
Where is it?
In Pangram - I, Silchar, Cachar, Assam.
How big is it?
It has a stated cost of ₹39 crore and a site of 11.2 acres.
When was it filed?
The application was filed on 28 Mar 2024.
Project details
| Official title | Environmental Clearance for Setting Up the Greenfield Plant for Production of 90,000tpa Tmt Bars Or Ms Re-Rolled Products by Installing Rolling Mill of 300tpd Capacity Along With Reheating Furnace (Coal Based) of Avg. Capacity Between 15-18tph by M/S Irid Casting Works LLP at Village – Pangram Part-I, P.O. Udharbond Dist. Cachar, Assam. |
|---|---|
| Status | Environmental approval granted |
| Status since | 11 Feb 2025 |
| Application filed | 28 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Irid Casting Works LLP |
| Land area | 11.2 acres (4.5 ha) |
| Project cost | ₹39 crore |
| Village / locality | Pangram - I |
| Taluk / tehsil | Silchar |
| District | Cachar |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00380 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 Mar 2024 (this page) | Environmental approval granted | 11.2 acres | ₹39 crore |
| Early planning filed 16 Nov 2022 | Cleared for impact study | 7.8 acres | ₹39 crore |
In context
12 applications in Cachar since January 2022 are in the same category (Industry): 10 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected. At 11.2 acres, this one is larger than 50% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pangram - I, Silchar, Cachar, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Barak Sand Minor Mineral Unit No. 1 near Kalain , P. O & P.S: Kalain,… — environmental approval granted, 450 m away
- Barak Sand Minor Mineral Unit No. 1 near Kalain , P. O & P.S: Kalain,… — cleared for impact study, 450 m away
- MODERNA ISPAT PRIVATE LIMITED- Manufacturer of TMT bars of capacity 30000 MTPA — more information requested, 5.8 km away
- Industrial project by Best Alloys Private Limited — cleared for impact study, 5.9 km away
- Jatinga River Minor Mineral Unit Sand — environmental approval granted, 6.4 km away
- Jatinga River Minor Mineral Unit Sand — lapsed, 6.4 km away
- Patta Land Ordinary Earth Mining Permit Area At Indragarh Block (Srikona),… — environmental approval granted, 7.4 km away
- Patta Land Ordinary Earth Mining Permit Area at Dholcherra Grant Mouza,… — lapsed, 7.9 km away