Cleared for impact studyIndustry · Kamrup, Assam

Regularization of Existing Production Facilities for TMT Bar - 84000 TPA, MS Coil - 12936 TPA, MS Black Wire -1116 TPA & MS Wire Nail - 792 TPA (Total Production Capacity Under (Total Capacity under Regularization – 98,844 TPA) and MS - Steel Billet – 66000 TPA through Induction Furnace (10 x 3 TPH) for which already got EC from SEIAA - Assam (EC Capacity 90,000 TPA) within same plant premises of M/s. K D Iron & Steel Co. (Seeking EC as per GOI Notification dtd. 20th July, 2022)

Regularization of Existing Production Facilities for TMT Bar - 84000 TPA, MS Coil - 12936 TPA, MS Black Wire -1116 TPA & MS Wire Nail - 792 TPA (Total Production Capacity Under (Total Capacity under Regularization – 98,844 TPA) and MS - Steel Billet – 66000 TPA through Induction Furnace (10 x 3 TPH) for which already got EC from SEIAA - Assam (EC Capacity 90,000 TPA) within same plant premises of M/s. K D Iron & Steel Co. (Seeking EC as per GOI Notification dtd. 20th July, 2022) is a proposed industrial project in Borsil (Barsil), Rangia Pt, Kamrup, Assam. The site covers 7.8 acres. Its stated project cost is ₹48.9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 29 Apr 2023).

See it on the live map All projects in Kamrup

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Regularization of Existing Production Facilities for TMT Bar - 84000 TPA, MS Coil - 12936 TPA, MS Black Wire -1116 TPA & MS Wire Nail - 792 TPA (Total Production Capacity Under (Total Capacity under Regularization – 98,844 TPA) and MS - Steel Billet – 66000 TPA through Induction Furnace (10 x 3 TPH) for which already got EC from SEIAA - Assam (EC Capacity 90,000 TPA) within same plant premises of M/s. K D Iron & Steel Co. (Seeking EC as per GOI Notification dtd. 20th July, 2022) is a proposed industrial project in Borsil (Barsil), Rangia Pt, Kamrup, Assam. The site covers 7.8 acres.

Who is building it?

The applicant is K D Iron and Steel Co.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 29 Apr 2023), as of 27 Nov 2026.

Where is it?

In Borsil (Barsil), Rangia Pt, Kamrup, Assam.

How big is it?

It has a stated cost of ₹48.9 crore and a site of 7.8 acres.

When was it filed?

The application was filed on 29 Apr 2023.

Project details

StatusCleared for impact study
Status since29 Apr 2023
Application filed29 Apr 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantK D Iron and Steel Co
Land area7.8 acres (3.1 ha)
Project cost₹48.9 crore
Village / localityBorsil (Barsil)
Taluk / tehsilRangia Pt
DistrictKamrup
StateAssam
Location fromSite boundary on record
Our referenceWID-AS-00406

In context

17 applications in Kamrup since January 2022 are in the same category (Industry): 13 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.8 acres, this one is larger than 71% of them.

12 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Borsil (Barsil), Rangia Pt, Kamrup, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.