Quick answers
What is this project?
Proposed Expansion of Existing Production Facilities for M.S. Billet (from 90000 TPA to 180000 TPA) through Induction Furnace (22 TPH x 2 and 15 TPH x 1) and Rolling Mill products (from 98844 TPA to 200000 TPA) By KD Iron & Steel Pvt. Ltd., at IIDC, Village Borshil, Sotshil, Po. Maranjana, P.S. Rangia, Tehsil - Rangia, Dist.- Kamrup (Rural), Assam – 781354 is an approved industrial project in Barkhil, Rangia Pt, Kamrup, Assam. The site covers 7.8 acres.
Who is building it?
The applicant is K D Iron and Steel Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Sept 2026), as of 27 Nov 2026.
Where is it?
In Barkhil, Rangia Pt, Kamrup, Assam.
How big is it?
It has a stated cost of ₹245 crore and a site of 7.8 acres.
When was it filed?
The application was filed on 22 May 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Sept 2026 |
| Application filed | 22 May 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | K D Iron and Steel Private Limited |
| Land area | 7.8 acres (3.1 ha) |
| Project cost | ₹245 crore |
| Village / locality | Barkhil |
| Taluk / tehsil | Rangia Pt |
| District | Kamrup |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01737 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 22 May 2026 (this page) | Environmental approval granted | 7.8 acres | ₹245 crore |
| Expansion filed 27 Apr 2026 | Environmental approval granted | 7.8 acres | ₹245 crore |
In context
17 applications in Kamrup since January 2022 are in the same category (Industry): 13 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.8 acres, this one is larger than 71% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barkhil, Rangia Pt, Kamrup, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Existing Production Facilities for M.S. Billet (from… — environmental approval granted, 0 m away
- Regularization of Existing Production Facilities for TMT Bar - 84000 TPA, MS… — cleared for impact study, 0 m away
- Moukuchi P.P. Land Ordinary Clay Mining Permit Area — environmental approval granted, 2.4 km away
- Joyshree Assam Industries — environmental approval granted, 2.5 km away
- Joyshree Assam Industries — environmental approval granted, 2.5 km away
- Moukuchi Ordinary Clay Mining Permit Area — environmental approval granted, 2.5 km away
- Moukuchi Ordinary Clay/Silt Mining Permit Area (Plot-1) — environmental approval granted, 2.5 km away
- Moukuchi Ordinary Clay/Silt Mining Permit Area (Plot-3) — environmental approval granted, 2.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.