What is Ashapuka Sand, Gravel and Boulder River Mahal?
Ashapuka Sand, Gravel and Boulder River Mahal is a lapsed mining project in Dongsiapara No-1, Sidli (Pt), Chirang, Assam. The site covers 11.3 acres.
Who is building it?
The applicant is Phungkha Narzary.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Dongsiapara No-1, Sidli (Pt), Chirang, Assam.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 11.3 acres.
When was it filed?
The application was filed on 12 Mar 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 12 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Phungkha Narzary |
| Land area | 11.3 acres (4.6 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Dongsiapara No-1 |
| Taluk / tehsil | Sidli (Pt) |
| District | Chirang |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00408 |
In context
35 applications in Chirang since January 2022 are in the same category (Mining): 11 approved, 3 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.3 acres, this one is larger than 77% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Dongsiapara No-1, Sidli (Pt), Chirang, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Agrong Sand, Gravel River Mahal — environmental approval granted, 6.5 km away
- Instalation of BSNL Tower — more information requested, 7.2 km away
- Dholadanda P.P. Land Sand, Gravel & Boulder Mining Permit Area — lapsed, 7.4 km away
- Lakhipur Village Patta Land Earth, Sand-Gravel & Stone Mining Permit Area — initial checks, 8.5 km away
- Makra River Sand-Gravel and Stone Mahal at (Patalmari) Rajapara Area — lapsed, 8.6 km away
- Kanamakra Sand, Gravel & Boulder River Mahal No. 1 — lapsed, 8.6 km away
- Narayanpur P.P. Land Sand, Gravel, Boulder & Ordinary Clay/Silt Mining Permit… — lapsed, 9 km away
- Kanamakra River Bed Sand, Gravel and Stone Mahal at Kanamakra Rajapara Area — environmental approval granted, 9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.