Quick answers
What is this project?
Extraction of Boulder From Brasang River (Block - 14) Mining Permit Area is an approved mining project in Na, Umrangso, Dima Hasao, Assam. The site covers 6.4 acres.
Who is building it?
The applicant is Dima Hasao Forest Division(West).
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 2 Nov 2024), as of 27 Nov 2026.
Where is it?
In Na, Umrangso, Dima Hasao, Assam.
How big is it?
It has a stated cost of ₹1 crore and a site of 6.4 acres.
When was it filed?
The application was filed on 23 Sept 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Nov 2024 |
| Application filed | 23 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dima Hasao Forest Division(West) |
| Land area | 6.4 acres (2.6 ha) |
| Project cost | ₹1 crore |
| Village / locality | Na |
| Taluk / tehsil | Umrangso |
| District | Dima Hasao |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00704 |
In context
90 applications in Dima Hasao since January 2022 are in the same category (Mining): 70 approved, 6 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6.4 acres, this one is smaller than 90% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Na, Umrangso, Dima Hasao, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diyung River Stone Boulder Mining Permit Area — environmental approval granted, 1.7 km away
- Borowapu Village Patta Land Stone Boulder Mining Permit Area — environmental approval granted, 2.2 km away
- Diyung River Block 3 River Boulder and Sand Gravel Mining Permit Area — environmental approval granted, 5.5 km away
- Diyung River Block 3 River Boulder and Sand Gravel Mining Permit Area — environmental approval granted, 5.5 km away
- Diyung River Block 2 Boulder and Sand Gravel Mining Permit Area — environmental approval granted, 5.8 km away
- Diyung River Block 2 Boulder and Sand Gravel Mining Permit Area — environmental approval granted, 5.8 km away
- Pangmul Village Stone Mining Permit Area — environmental approval granted, 7.7 km away
- Diyung River Block 1 River Boulder and Sand Gravel Mining Permit Area — environmental approval granted, 8.2 km away
More from Dima Hasao Forest Division(West) in Dima Hasao
- Kapili River Sand Mining Permit Area (Plot-1) — environmental approval granted
- Sand Gravel and Boulder Mining Permit Area at Mahurbra Area of Mahur River — lapsed
- Diyung River Sand Gravel & Boulder Mining Permit Area a Dokhongma — not approved
- Sand Gravel and Boulder Mining Permit Area at Dikrengma Area of Diyung River — not approved
- Jinam River Boulder and Sand Gravel Mining Permit Area — environmental approval granted
- Kapili River Sand Mining Permit Area (Plot-3) — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.