Quick answers
What is Borowapu Village Patta Land Stone Boulder Mining Permit Area?
Borowapu Village Patta Land Stone Boulder Mining Permit Area is an approved mining project in Na, Umrangso, Dima Hasao, Assam. The site covers 4 acres.
Who is building it?
The applicant is David Naiding.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 2 Nov 2024), as of 27 Nov 2026.
Where is it?
In Na, Umrangso, Dima Hasao, Assam.
How big is it?
It has a stated cost of ₹20 lakh and a site of 4 acres.
When was it filed?
The application was filed on 28 Sept 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Nov 2024 |
| Application filed | 28 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | David Naiding |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Na |
| Taluk / tehsil | Umrangso |
| District | Dima Hasao |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00831 |
In context
90 applications in Dima Hasao since January 2022 are in the same category (Mining): 70 approved, 6 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4 acres, this one is smaller than 94% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Na, Umrangso, Dima Hasao, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diyung River Stone Boulder Mining Permit Area — environmental approval granted, 900 m away
- Extraction of Boulder From Brasang River (Block - 14) Mining Permit Area — environmental approval granted, 2.2 km away
- Diyung River Block 2 Boulder and Sand Gravel Mining Permit Area — environmental approval granted, 5.7 km away
- Diyung River Block 2 Boulder and Sand Gravel Mining Permit Area — environmental approval granted, 5.7 km away
- Diyung River Block 3 River Boulder and Sand Gravel Mining Permit Area — environmental approval granted, 5.9 km away
- Diyung River Block 3 River Boulder and Sand Gravel Mining Permit Area — environmental approval granted, 5.9 km away
- Assam/PSP04 — cleared for impact study, 7.2 km away
- Diyung River Block 1 River Boulder and Sand Gravel Mining Permit Area — environmental approval granted, 7.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.